Loading…
Loading…
10,401 results • Best match
Construction Of CC Road At Bhalegaon Tq Mehkar Dist Buldana
1) Construction Of CC Road Gp Bhalegaon Tq Mehkar Dist Buldana
Road improvement work by paver finisher machine from the house of Madhukar Ojha (Advocate) to CMS School and via Sanjay Stationery to the house of N.C. Bhatnagar in Mo. Anand Nagar under Guru Govind Singh Ward.
Scraping of old bituminous road manually and disposal etc.
Construction of road from Bhandarimunda to Bhagabanpur Road
Construction of Granular Sub Base Grading III material as per table 400-1 spreading in uniform layers with moto grader on prepared surface, mixing by mix in place method with rotavator at OMC & compacting with vibrator roller to achieve the desired density complete as per clause 401 of Mo SRT&H specifications for Road & Bridge works ( 4th revision)
Risk and cost works of Ms SP Pandoh Takoli Kullu Highway Pvt Ltd on Four laning of end of Pandoh bypass to Takoli section of NH 21 from km 221305 to km 242000 in the state of Himachal Pradesh International Competive Bidding
Construction of road from Rabipur to Khairnali
Earth work in embankment with approved materials obtained from borrow pits with all leads and lifts transporting to site,spreading, grading to required slope and compacting at OMC by Vibratory Roller to meet the requirement of Table-300.2 as per Clause 305 of MoRT&H Specifications dfor Road & Bridge works(4th Revision) complet including cost,conveyance,Royalities,Taxes of all materials,all labours,hire and running charges of all machineries,T&P ,sundries etc. complete as per spcification and direction of Engineer-in-Charge.
Request for Proposal (“RFP”) issued by NHIT Western Projects Private Limited (NWPPL) for Engagement of Agency/Firm for Reinforced cement concrete (RCC) pipes Drain Works at Bijoliya on four-lane of Chittorgarh-Kota Road Section of NH-27 (project length – 160.50 kms.) in the state of Rajasthan.
Reinforcement Steel: All charges for providing, cutting, bending, transporting, and tying reinforcement steel of designation TMT FE 500 as per IS 1786 for construction work. The vendor shall supply all necessary steel and 18 gauge black annealed binding wire. Reinforcement steel bars are to be cut, bent, and tied per approved bar bending schedules and structural drawings, ensuring precise dimensions and placements. Steel bars shall be securely tied at all intersections using 18-gauge black annealed binding wire to maintain stability during concrete placement. Laps shall conform to MoRTH specifications and as directed in drawings, with no separate payment for laps or overlaps as per MoRTH Clause 1600. Proper clear cover shall be maintained with spacers and chairs as per drawings and CPWD standards. Steel will be measured by weight in kilograms, excluding binding wire and without allowances for overlaps or wastage. The scope of work includes supply, handling, and on-site quality assurance for positioning, alignment, and compliance with specifications and as directed by EIC. Safety measures and quality checks shall be implemented during all stages, ensuring high-standard reinforcement for structural integrity. Reinforcement bars from the approved make shall only be used.