Loading…
Loading…
10,442 results • Best match
Emergency rectification work for distribution line,repairing of bursting,ferrule valve restopration of road and laying of balance distribution line at Dalurbandh ,AB pit ,Ambagan and its adjacent area for smooth running of water supply within Ramnaga
Emergency rectification work for distribution line, repairing of bursting, ferrule valve restopration of road and laying of balance distribution line at Dalurbandh ,AB pit ,Ambagan and its adjacent area for smooth running of water supply within Ramnagar H/W site area under RCFA Division-I PHE Dte. (Including 18% GST & 1% Cess)
Repair and improvement of built-up section having length 7.300 Km and Maintenance work from Km 0.000 to Km 51.600 of NH-321G Agra-Jalesar Road on EPC mode in the state of Uttar Pradesh Agra Distt.
Sub: BID for “Repair & improvement of built-up section having length 7.300 Km and Maintenance work from Km 0.000 to Km 51.600 of NH-321G(Agra-Jalesar) Road on EPC mode in the state of Uttar Pradesh Agra Distt.
In ward no. 02, work of interlocking road and CC repair from Vijay Kumar house to S.K. Pandey, Shri H Mishra house to Kalika, Santosh, Mahesh Nishad house to Sunita, Bright Career Public School, Adarsh Gyan Nikunj School to Ram Sevak Tiwari hou
Dismentling of old interlocking birks on road all com. Work etc.
Construction of CC Road at ward 3 Gokuldham Colony in Mullaji house to Badoliji house.
CC Road Work
Construction of concrete road
Construction of concrete road from the house of Jhareswar Samanta (Plot-60, JL -241) to the house of Parameswar Karan(Khatian No-120, JL-241 of Mouza Raniorda of, Kusumpur GP, Contai-III Block in the Purba Medinipur District. (As per Annexure_VIII)
Civil works
Construction of granular sub-base by providing Close graded Granular subbase Grading-III material as per table 400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per Clause 401 of MoSRT&H Specifications for Road & Bridge works (4th Revision)