Loading…
Loading…
10,946 results • Best match
Construction of concrete road from main road to Golabari Ghosh Para under Mamudpur-II GP of Monteswar Block, Purba Bardhaman,Fund-BEUP(2022-23)(1st and 2nd Phase)
Construction of concrete road from main road to Golabari Ghosh Para under Mamudpur-II GP of Monteswar Block, Purba Bardhaman,Fund-BEUP(2022-23)(1st and 2nd Phase)
Construction of Limpara to Kherat (NH 59 Road) in the district of Bolangir under MMSY-TRIP for the year 2024-25
Construction of Un-reinforced,plain cement concrete pavement M-30 grade over a prepared sub base with... compacted finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, ...
Ward 14 Mohalla Chishti Road Construction of cc road and drin repair from From Chisti Road Gest House To Via Makbara Chisti Sahab gate.
Construction of un-reinforced, dowl jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared ...
Construction of RD Road to Bandhapada in the district of Nuapada under Scheme Mukhya Mantri Sadak Yojana (MMSY) for the year 2026-27
Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared... and finished in continuous operation including provision of contraction and expansion, construction joints, primer, sealant, near approaches to bridge/culvert or at any approved portion of road and construction joints, admixtures as approved, curing of concrete slabs for 14-days as per MoRD including ...
Construction of CC road from the gate to the houses of Kallu and Ramswayambar in Ward No. 08 Kamadgiri Society.
Construction of CC road from the gate to the houses of Kallu and Ramswayambar in Ward No. 08 Kamadgiri Society.
Providing and Laying G-1,G-II,Surface Dressing , SS-I, Rs-I and 25 mm thick Bituminous Concrete
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 Kg/Sqm (Zero point Eighty five Kilogram) per Square meter. using mechanical means as per Techanical Specification Clause 502 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.