Loading…
Loading…
10,946 results • Best match
Re-Construction of Bridge in road from Hultikoppa- Hecche Major District road at ch 5.26 km in Soraba Taluk
... ………………………….. is a reputed company with a good financial standing. If the contract for this work, namely............................................................................... ...
Construction of C C Road From Siddappa Mannikeri Road To Lakkappa Kenchanavar House AT Naganur Village In Mudalagi Taluka
Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size mad...
Construction of Jugsaipatna to Herlaguda Road in the district of Kalahandi under Mukhya Mantri Sadak Yojana for the Year 2026-27
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by manual means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H Specifications for Road & Bridge works (4th Revision)and as per the direction of engineer in charge.
CONSTRUCTION OF PAKERPARA TO BANDHATOLI APPROACH ROAD LENGTH 2.28 K.M. OF DISTRICT JASHPUR
Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia., across the road ( new construction ) , extending from drain to drain in cuts and toe of slopes to toe of slopes in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides ...
Construction of Cement Road Road Side Drain Paving Block from Lodhi Babu Kirana shop to Raju Patel in Prabhag No. 09 in Municipal Council Saoner
Construction of Cement Road, Road Side Drain & Road side Paving Block from Lodhi Babu Kirana shop to Zenda Chowk, Sukhdev Baswar to Arvind, Pannam, Prem Thakur to Shiv Mandir, Vinod Budholiya to Poonam Khorghade & from Ajay Nagare to Raju Patel in Prabhag no 09 At Nagar Parisad Saoner
Construction and Maintenance of RD road to Ambobali under MMSY Scheme in the district of Rayagada the year 2026 2027
Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared... and finished in continuous operation including provision of contraction and expansion, construction joints, primer, sealant, near approaches to bridge/culvert or at any approved portion of road and construction joints, admixtures as approved, curing of concrete slabs for 14-days as per MoRD including ...