Loading…
Loading…
11,635 results • Best match
Construction work of drain and CC road from Bhagwan Talkies to Chhotelal house in Mo. Islamnagar
Road Work
Construction work of drain and interlocking road from Idgah culvert to the temple in front of Mo. Billiganj.
25-MM thick flooring between drain 1:2:4Cement concrete in 6 prop. Of 1:2:4 with cement coarse sand and 2 cm guage graded stone grit in road work incl..... All work comp. S.O.R. NO. 279(i)
CC road construction work in conservancy street behind Rotigar in ward No.22 in under cmc limits chamarajanagara.
CC road construction work in conservancy street behind Rotigar in ward 22 in under cmc limits chamarajanagara.
Construction work of RCC pillars etc. under the overbridge on Shivgarh Road link road in Mohalla Chandrika Nagar under Ward No. 08
Mild steel/reinforcement work in plain work including supply of all sted and wastage & over lapping & hooks all respects as per pd. S.INS. 504
Under Pt. Deen Dayal Upadhyay Yojna-Work-2- Construction of CC Road from Railway Road to House of Nepal Singh via Dudheshwar Temple at Main Road Escort Colony Road in Ward-09
12mm thick plaster with cement and coarse sand pf 2.20 fineness modules in 1:4 over brick work minumum thickness not to be less than 1cm. Including supply of all materials, labour, tools & plant etc. required for proper completion of the work. As per S.I. No.584
Construction work for a CC road in Ward 02 Chariya extending from the existing CC road up to the front of the Gaushala
Construction of un-Reforced, dowel jointed at expension and construction joint only, plain cement concrete pavement, thickness as per desingn, overa prepared sub base, with 43 grade cement or any other type as per clause 1501 2.2 M30 Grade, coarse and fine aggregate conforming to IS 383 macadam size of coarse aggregate not exceeding 25mm mixed in a concretee mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved n i mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polthene fim, wedges, steel plates including leveliing the formwork as per drawing), spreading the concrete with showels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provisiion of contraction and expansion, construction ljoints, applying, deboinding strips, primer sealant, dowel bars, near approaches to bridge/ culvert and construction joints admixtures as approved, curing of concrete slabs for 14-days curing compound where specifed and water |finishing to lines and grade as per drawing and technical specification on