Loading…
Loading…
11,625 results • Best match
REPAIR/ MAINT/ REPLACEMENT OF UNSV XLPE UG CABLES, DISTRIBUTION PANELS, REPAIR OF EARTHING, FOUNDATION WORK ETC INCLUDING ALLIED WORKS AT ZONE A OF BAGRAKOTE UNDER GE SEVOKE ROAD
Taking down existing faulty LT UG cable line 1100V of any size from existing location and relaying serviceable portion of LT UG cable after necessary repair work at fault location, providing joints etc. if required all as specified and as directed (Note: Items required for repair, joint and excavation works will be measured and paid separately under relevant items. Only serviceable portion relayed shall be measured for payment)
Zonal contract for minor constructions, repair works and supply of building materials for service, Welfare buildings and drains inside North colony, between Konnur high road & New Avadi Road and between Ambedkar road & eastern side compound wall of ... Ambedkar road (including) ... high road & ... Avadi road for ...
LAC ADS Construction of Vemblay thodu road and culvert in ward 6 of Kuzhuppilly gramma panchayath work General Civil Work
OD34/2026-2027:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material
Drain from Jitendra Singh house to Zafar house in Shantinagar ward CC Construction work of interlocking road
Drain from Jitendra Singh house to Zafar house in Shantinagar ward CC Construction work of interlocking road
Soil boring and testing work for replacement of damaged bridge over L/S of navigation channel of main irrigation canal at 10th km of Shikarpur-Galsi road under Asansol Highway Division,
Mobilisation Charges of all tools & Plants along with accessories, material, labour, supervision etc. at site of work required in connection with boring and testing work, including setting up boring rigs and shifting to different Bore-hole points etc. and also including withdrawal of same from the site after completion of work, complete as per direction of Engineer-in-Charge. b) Detailed Investigation Payment will be made after successful completion of work. Preliminary Investigation is mainly for collection of disturbed samples where deployment of heavy machineries is not involved.
Construction of Sihora BY-PASS With Electrification Work (C.C.) Road Length 0.80 Km. Under Sub Division Gadarwara. (7th Call)
Construction of Sihora BY-PASS With Electrification Work (C.C.) Road Length 0.80 Km. Under Sub Division Gadarwara.