Loading…
Loading…
10,652 results • Best match
Construction of Breached portion of Aqueduct, SR Road & Head wall at Ch 11.000 Km of 25th Block Nargund Branch Canal.
Construction of Breached portion of Aqueduct, SR Road & Head wall at Ch 11.00 Km of 25th Block Nargund Branch Canal.
Construction of PCC Road from Peer Baba Asthan via Rajesh Yadav House to Anil Yadav House in Ward No -- 07
S.NO. ITEM OF WORKS UNIT QTY. RATE (in fig.) Amount
CONSTRUCTION OF HIGH LEVEL BRIDGE I/C APPROACHES ACROSS THE SENDUR RIVER ON KEREGAON - GATTASILLI ROAD IN K.M. 4/10
Santragachi - Amta : Construction/ Improvement of approach road at Dakshinbari, Maju, Jalalsi & Harishdadpur stations under the jurisdiction of Sr.DEN/East/KGP.
... per actual driven length of rail which will be supplied free by Railways at the site of work. KHARAGPUR DIVISION-ENGG/SOUTH EASTERN RLY Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations ...
Ward 18, Zone 03A Construction of road and footpath using Hot Mix from Gulmohar School Crossing to the Canal Embankment
... premixed with bituminous binder @ 5.40% of Mix and filler transporting the Hot Mix to work site, laying with a hydrostatic paver finisher with senser control to the required grade... alignment, rolling with smooth wheeld vibratory and tendem rollers to acheive the desired construction as per MORT&H specification clause No.507 complete in all respects.
27.Construction of CC road and slab from Pradeep house to Hakim Singh house in Mohalla Indra Nagar, Shanti Colony.
Earth work in embankment mechanically compacted to 95% proctor density in ordinary soil excavation to be done in form of regular pits not exceeding ½ M in depth and earth work to be done in 20 cm. layers including ramming and dressing pulvarization the surface ...