Loading…
Loading…
1,48,142 results • Best match
Gravel Road Construction Work Ruggapura to Shamshan Ghat Ruggapura
eProcurement System Government of Rajasthan Created By: RAVINDRA KUMAR MEENA Created Date/Time: 08-Jan-2026 05:07 PM Tender Title: Gravel Road Construction Work Ruggapura to Shamshan Ghat Ruggapura Tender ID: 2025_PRD_524376_4
AMRUT AMRUT 1.0 GURUVAYUR ZONE RESTORATION WORKS OF NJARKOLLI KADAVALLI ROAD BALANCE WORKS IN WARD 8 GURUVAYUR MUNICIPALITY General Civil Work
RESTORATION WORK
Potholes and Patch repairing at Naxalbari-kharibari Road from 2.00 km to 2.70 km and 3.00 km to 3.30 km (in stretches) in the district of Darjeeling Under North Bengal Construction Division, PWD, Siliguri. During the year 2025-26
eProcurement System of Government of West Bengal Created By: SANIUL ISLAM Created Date/Time: 10-Mar-2026 01:48 PM Tender Title: Road work Tender ID: 2026_WBPWD_1008850_1
Road work
Improvements to the Ajithalayam road and branch roads and construction of drain near Devan’s house.
Providing speed breaker with studs and painting work on BT surface road at highway road junction within Municipal limit in Colachel municipality
Road Markers/Road Stud with Lens Reflector Providing and fixing reflective road studs of ‘category A’ Raised pavement markers made out of poly carbonate / methyl methercrylate/ABS moulded body confirming to ASTM D 788 and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro reflectance and chromaticity values conforming to ASTM D4280. The reflective raised pavement markers shall also confirm to the MoRT&H circular No RW / NH. 33023/10/ 97-DO. III dt 11.06.97. The height, width and length shall not be less than 15 mm, 90 mm and 100 mm and with minimum reflective area of 13 Sq.cm on each side and the slope to the base shall be (+/-) 5 degree. Each reflector shall have a CIL not less than values specified in Table 2 of said MoRT&H circular. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 (+/-) 2mm and height not less than 30 (+/-) 2 mm) from the body is to be a minimum value of 500 Kgf. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer. The marker shall support a load of 13635 Kg tested in accordance with ASTM D4280 and confirming to IRC 35 - 2015 guidelines and MoRT&H specification 804 etc., complet
Road and dran construction work