Loading…
Loading…
1,48,223 results • Best match
Road work
eProcurement System Government of Odisha Created By: Mohammed Shahbaz Created Date/Time: 02-Dec-2025 01:27 PM Tender Title: S/R to Cuttack City Internal road for the year 2025-26 such as construction of Humps, speed breakers along with signage, road marking and median repair with painting Tender ID: 2025_EICCL_121766_1
Graval Road Construction work Ringya Ki dhani se Badi Wali Bairwa Dhani tak Nangal Road Chhareda
Graval Road Construction work Ringya Ki dhani se Badi Wali Bairwa Dhani tak Nangal Road Chhareda, G.P. CHHAREDA (NANGAL RAJAWTAN) as per G Schedule attached in tender farm
sign boards ,place identification boards, crash barrier,road markings and road studs
8.35:Providing and fixing reflective road studs (Raised Pavement Marker) of ' category A' made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3 Road Markers/Road Stud with Lense Reflector :-
New Construction work on Bhopa Road Makiyali Bindal Wire Factory to Chandpur Link Road.
eProcurement System Government of Uttar Pradesh Created By: GAGAN . Created Date/Time: 02-Jan-2026 05:14 PM Tender Title: New Construction work on Bhopa Road Makiyali Bindal Wire Factory to Chandpur Link Road. Tender ID: 2025_CEMRT_1099484_1
CC road construction work on the banks of Sitamau pond.
CC road construction work on the banks of Sitamau pond.
Garidhura Mirik Simanabusty Road at Ch. 10.30 km Protective work (Khad Side) under Darjeeling Highway Division in the district of Darjeeling during the year 2025 -2026
Dry Rubble Flooring Construction of dry rubble flooring at cross drainage works for relatively less important works. Boulder 150mm to 225mm @ 1.00 m3/m3 (With Stacking) Bazree 11.20 mm @0.20 m3/m3 (With Stacking)