Loading…
Loading…
1,47,482 results • Best match
item for pot hole filling, WMM , GSB, Close Grade Premix Carpet and necessary road safety items , reconstruction of the drain,PCC M 15 raft, sidewall.
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
Under the State Road Fund Scheme Construction work and 5-year maintenance work of the link road from Inhauna Maharajganj road Ratwalia to Sarvjeet Bazar road via Dandupur
eProcurement System Government of Uttar Pradesh Created By: Ramesh Chandra Created Date/Time: 09-Jun-2026 05:16 PM Tender Title: Under the State Road Fund Scheme Construction work and 5-year maintenance work of the link road from Inhauna Maharajganj road Ratwalia to Sarvjeet Bazar road via Dandupur Tender ID: 2026_CEUFZ_1154622_2
New Construction work of New Construction work of Village Gonch to Kanakor road
eProcurement System Government of Uttar Pradesh Created By: SANJEEV KUMAR JAIN Created Date/Time: 23-Mar-2026 05:48 PM Tender Title: New Construction work of Village Gonch to Kanakor road Tender ID: 2026_CEBLY_1112186_6
New Construction work on Asalatpur village Karhaida road to Asalatpur village road.
eProcurement System Government of Uttar Pradesh Created By: RAM RAJA Created Date/Time: 19-Mar-2026 05:17 PM Tender Title: New Construction work on Asalatpur village Karhaida road to Asalatpur village road. Tender ID: 2026_CEMRT_1123210_5
New Construction work of Kuberpur to Rehankala Road (Rehankala Fatak) Tak Road
Construction of embankment with Material Obtained from Availble Land Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1. with all lifts and leads,1000M spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
CC Road construction work from GSS Bhutivala Road to the cremation ground
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m