Tender Value
₹7.8 L
EMD Value
₹7,818
Closing Date
9 Oct 2026, 4:00 pm7d left
Nandikotkur Municipality
Nandikotkur
Laying of CC road from 16-427-2 to 16-473-1 in ward no 14, Nandikotkur Municipality
996872
6-3/DTCP (LRS/BPS)/Engg/Works/NDKTR/2026.
OPEN - NCB
Road Work
NANDYAL, ANDHRA PRADESH
7 documents required · 6 mandatory · 1 optional
₹277
₹7,818
1 Oct 2026
1 Oct 2026
1 Oct 2026
Earthwork excavation for road way in soil by mechanical means including cutting and loading in tippers trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to the embankment location or disposal of unserviceable soil with all leads and lifts etc., complete for finished item of work for trench cutting as per MORT&H specification No.301 and as directed by the Engineer-in-Charge
Construction of Granular sub-base by providing HBT(Trap) material confirming to Grading - V of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. Excluding Seingorage Charges
Providing, Laying, Spreading and compacting graded HBT(Trap) crushed stone aggregate to Wet Mix macadem specification (5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. Excluding Seingorage Charges
Construction of VCC M30 grade design mix un-reinforced, expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per IS codes , coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 21- days, and water finishing to lines and grade as per drawing and Technical Specification (Note: - Payment will be released only after satisfactory core results of the concrete strength for 28 days as per IS code)
Collection, supply, and filling of Gravel from approved quary to work site and stacking at work site to Dept. gauge for premeasurements including cost and conveyance of all materials, labour charges etc., complete as per standard specifications. Clause 305.39 MORD & 304 MORTH etc., complete and as directed by Engineer in Charge of work
Earthwork in excavation for Drain as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. (By Manual Means) RBR-FNDN-1
Supply and filling with Sand in levelling course complying with standard specifications including cost and conveyance of sand to site to work labour charges watering tamping, ramming etc complete and as directed by the Engineer-in-Charge of the work (APDSS No.101).
Laying Cement concrete (1:4:8) using 40mm nominal size HBG metal M/C including cost and conveyance of all materials from approved quarry, machine mixing, laying, levelling, ramming, curing and labour charges etc., complete. As per APSS 402. BLD-CSTN-2-5
V.C.C. (1:3:6) using 20mm (SS-5) HBG M/C graded Metal and OPC course and fine agregates conforming to IS:383 including cost and conveyance of all materials, Labour charges, Machine Mixing, vibrating, laying in position quring for 21 days excluding centering charges as per APSS - 402. FOR Bed concrete and Side Walls
Plastering in CM (1:3) Prop, 12 mm thick using OPC grade cement including cost and conveyance of all materials, labour charges such as scaffolding, mixing mortar lift charges curing complete etc., BLD-CSTN-6-3/53.
Providing and laying reinforced cement concrete design mix RCC M 20 Using Concrete Mixer in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH For Culvert
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) bars (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work.
Assistant Engineer
Nandikotkur Municipality
Earthwork excavation for road way in soil by mechanical means including cutting and loading in tippers trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to the embankment location or disposal of unserviceable soil with all leads and lifts etc., complete for finished item of work for trench cutting as per MORT&H specification No.301 and as directed by the Engineer-in-Charge
Construction of Granular sub-base by providing HBT(Trap) material confirming to Grading - V of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. Excluding Seingorage Charges
Providing, Laying, Spreading and compacting graded HBT(Trap) crushed stone aggregate to Wet Mix macadem specification (5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. Excluding Seingorage Charges
Construction of VCC M30 grade design mix un-reinforced, expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per IS codes , coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 21- days, and water finishing to lines and grade as per drawing and Technical Specification (Note: - Payment will be released only after satisfactory core results of the concrete strength for 28 days as per IS code)
Collection, supply, and filling of Gravel from approved quary to work site and stacking at work site to Dept. gauge for premeasurements including cost and conveyance of all materials, labour charges etc., complete as per standard specifications. Clause 305.39 MORD & 304 MORTH etc., complete and as directed by Engineer in Charge of work
Earthwork in excavation for Drain as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. (By Manual Means) RBR-FNDN-1
Supply and filling with Sand in levelling course complying with standard specifications including cost and conveyance of sand to site to work labour charges watering tamping, ramming etc complete and as directed by the Engineer-in-Charge of the work (APDSS No.101).
Laying Cement concrete (1:4:8) using 40mm nominal size HBG metal M/C including cost and conveyance of all materials from approved quarry, machine mixing, laying, levelling, ramming, curing and labour charges etc., complete. As per APSS 402. BLD-CSTN-2-5
V.C.C. (1:3:6) using 20mm (SS-5) HBG M/C graded Metal and OPC course and fine agregates conforming to IS:383 including cost and conveyance of all materials, Labour charges, Machine Mixing, vibrating, laying in position quring for 21 days excluding centering charges as per APSS - 402. FOR Bed concrete and Side Walls
Plastering in CM (1:3) Prop, 12 mm thick using OPC grade cement including cost and conveyance of all materials, labour charges such as scaffolding, mixing mortar lift charges curing complete etc., BLD-CSTN-6-3/53.
Providing and laying reinforced cement concrete design mix RCC M 20 Using Concrete Mixer in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH For Culvert
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) bars (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
6-3 Tender document.DOC
TENDER_DOCUMENT • 0.33 MB
6-3 BOQ.xls
TENDER_DOCUMENT • 0.05 MB
6-3 NIT.doc
TENDER_DOCUMENT • 0.14 MB
6-3 Online BOQ.xlsx
TENDER_DOCUMENT • 0.02 MB
6-3 Tender document_1.DOC
TENDER_DOCUMENT • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .