Loading…
Loading…
378 results • Best match
MACHINING AND STELLITING OF VALVE SEAT
VALVE SEAT (SPARE) (HW-293.78) -- MACHINING AND STELLITING AS PER DRG. 21122201003 REV.03 SCRAP WT : 57.95 KG per No.
Replacement of damaged cold water over head tank Labour Contract
1. Dismantling of damaged hot water over head tank and lead to Scrap yard. 2. Fabrication and Erection of cold water over head tank by 10 and 12mm MS plate and supporting angles. 3. Providing of stiffener at inside of the tank if necessary. 4. During erection if any existing Pipe lines, supports, platform, valves and nipple taping removal involves, contractor should repositioning the same without any extra cost. 5. Providing of supports, outlet, inlet nipples and valves. 6. Hydraulic test shall be taken for leak proof. 7. The Approximate weight of the contract work will be around 6.00 MT approximate. NOTE: before quote rivew the scope of work and terms and conditions
Spares for overhauling of oil skimmer model 6V. 1) Oil collector tube of endless loop for tube oil skimmer model 6V. (30Ft. Endless Loop), Part No: 1TU, Qty - 01 No. 2) Ceramic Scrapers part No: 4R, Qty-04 Nos. 3) Pulley wheel scraper, part No: 2UV, Qty-01 No.
Description :Spares for overhauling of oil skimmer model 6V. 1) Oil collector tube of endless loop for tube oil skimmer mo del 6V. (30Ft. Endless Loop), Part No: 1TU, Qty - 01 No. 2) Ceramic Scrapers part No: 4R, Qty-04 Nos. 3) Pulley wheel scrap er, part No: 2UV, Qty-01 No. [ Warranty Period: 30 Months after the date of delivery ] ] Consignee SSE/ELE/DSL/ED, SR Tamil Nadu 1.00 Set
Replacement of Pan No 6 Vapour line with bend and Pan No 5 vertical portion Labour Contract
1. Dismantling of damaged of Pan No.6 Vapour line with bend and Pan No.5 vertical portion 3 meter length and lead to Scrap yard. 2. Fabrication and Erection of Pan No.6 Vapour line with bend and Pan No.5 vertical portion by 12mm MS plate. 3. Providing of stiffener at inside of the tank if necessary. 4. During erection if any existing Pipe lines, supports, platform, valves and nipple taping removal involves, contractor should repositioning the same without any extra cost. 5. Providing of supports, outlet, inlet nipples and valves. 6. Hydraulic test shall be taken for leak proof. 7. The Approximate weight of the contract work will be around 7.00 MT approximate. NOTE: before quote rivew the scope of work and terms and conditions
Crown Pinion into New Machined teeth
Old worn out Crown Pinion (Scrap) will be provided by the Mills to party. Party will quote seprate rate on per kg. basis. Final weight of old material will be considered as per SCSM weighment scale at the time of dispatch of material
Boundary wall and Entry Gate Pillars at Mechanical Sub Division Karnal Meerut Road Karnal
Demolishing Brick work Manually by Mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meter lead as per direction of Engineer-in-charge as per HSR item No. 5.7.4