Loading…
Loading…
441 results • Best match
special repairing of 200A motor control panel board, S/F of 90/100 Watt LED flood light etc. and allied works at clear water P/Plant Jhajhapara. Special Repairing, overhauling and servicing of 20 HP VT pump set, repairing and servicing of 160 Amp. Mo
Cost towards all labour, tools, tackles and technician for opening, dismantling, repairing and overhauling of 20 HP 04 stage bowl assembly VT pump having head 29 meter, discharge- 30 LPS speed 1460 rpm with changing of following accessories. i. C.I. retainer bearing (Spider bearing)-05 Nos. as per sample. ii. Spider cut less rubber bushes- 05 Nos. iii. Locks. iv. 30mm dia. S.S. line shaft- 10 ft. each 3 Nos. v. 30mm dia. S.S. line shaft- 5 ft. each 2 Nos. vi. 30mm dia. S.S. head shaft- 5 ft. each 1 No. vii. S.S. shaft coupling (S.S Socket) -6 Nos. viii. 30 mm S.S. shaft & lever (S. S. Bush)-6 Nos. ix. S. Box –bush-01 No. x. S.S. Reducing Socket-01 No. xi. Impeller copper bush-8 Pcs. xii. Ferro collar ball rubber bush- 4 Pc. xiii. Ball sleeve bush- 04 Nos. Changing Nut Bolts of Column pipe joints & VT pump bowl assembly with S.S. nut bolts -10 kg etc. as per sample all materials as per required reassembling the same at workshop, complete lathe work for line shaft threading, key & lock making and refitting etc. all complete job. (rate after deducting the scrap materials).
Replacement of Old and damaged 400 sq.mm x 3.5 core Al Service cable, Supplying and Fitting of 630A TPN Main switch with DIN type fuse link, supplying and fitting of wash motor with all fitting, repairing and servicing 630 Amp. Panel board with FASD
Cost towards all labour, tools, tackles and technician for opening, dismantling, repairing and overhauling of 25 HP 04 stage bowl assembly VT pump having head 29 meter, discharge- 123 m3/hr. speed 1460 rpm. with changing of following accessories. i. C.I. retainer bearing (Spider bearing)- 05 Nos. as per sample. ii. Spider cut less rubber bushes- 05 Nos. iii. Locks. iv. 30mm dia. S.S. line shaft- 10 ft. each 3 Nos. v. 30mm dia. S.S. line shaft- 5 ft. each 2 Nos. vi. 30mm dia. S.S. head shaft- 5 ft. each 1 No. vii. S.S. shaft coupling (S.S Socket) -6 Nos. viii. 30 mm S.S. shaft & lever (S. S. Bush)-6 Nos. ix. S. Box –bush-01 No. x. S.S. Reducing Socket-01 No. xi. Impeller copper bush-10 Pcs. xii. G.M. impeller- 4 Nos. xiii. Ferro collar ball rubber bush- 8 Pc. xiv. Ball sleeve bush- 08 Nos. Changing Nut Bolts of Column pipe joints & VT pump bowl assembly with S.S. nut bolts -10 kg etc. as per sample all materials as per required reassembling the same at workshop, complete lathe work for line shaft threading, key & lock making and refitting etc. all complete job. (rate after deducting the scrap materials).
Supply of Heavy/ETP Chemicals
Hand Gloves for Disposal.
complete repairing, overhauling and servicing of 75 HP centrifugal pump having 1475 rpm Discharge-90 m3/hr, Head-103 meter, rewinding and reconditioning of 75 H.P. 440 volts, 50c/s, Star delta, 3-phase, squirrel cage induction motor, S/F of 100 mm
Cost towards all labour, tools, tackles and technician for opening, dismantling, repairing and overhauling of 25 HP 04 stage bowl assembly VT pump having head 42 meter, discharge- 90 m3/hr. speed 1460 rpm. with changing of following accessories. i. C.I. retainer bearing (Spider bearing)-05 Nos. as per sample. ii. Spider cut less rubber bushes- 05 Nos. iii. Locks. iv. 30mm dia. S.S. line shaft- 10 ft. each 3 Nos. v. 30mm dia. S.S. line shaft- 5 ft. each 2 Nos. vi. 30mm dia. S.S. head shaft- 5 ft. each 1 No. vii. S.S. shaft coupling (S.S Socket) -6 Nos. viii. 30 mm S.S. shaft & lever (S. S. Bush)-6 Nos. ix. S. Box –bush-01 No. x. S.S. Reducing Socket-01 No. xi. Impeller copper bush-10 Pcs. xii. G.M. impeller- 4 Nos. xiii. Ferro collar ball rubber bush- 8 Pc. xiv. Ball sleeve bush- 08 Nos. Changing Nut Bolts of Column pipe joints & VT pump bowl assembly with S.S. nut bolts -10 kg etc. as per sample all materials as per required reassembling the same at workshop, complete lathe work for line shaft threading, key & lock making and refitting etc. all complete job. (rate after deducting the scrap materials).
CNC Horizontal Boring and Milling Machine with Travelling
Chip disposal system with Bin As per Technical Specification
SOLID AND LIQUILD WASTE MANAGEMENT
Septic Tank Collection and Disposal Services - 3000 ltrs capacity up to 25.00 K.M