Loading…
Loading…
1,280 results • Best match
IMPROVEMENT/REPAIR IN EXTERNAL ILLUMINATION, PUBLIC LIGHTS, GATE LIGHTS AND PATH LIGHTS, PERIMETER LIGHTS AT TECH/DOMESTIC AREA OF AFS YELAHANKA
Supply and fix in repairs of “Lithium based Energy Efficient Integrated Solar Street Light of 40Watt” in rust proof Aluminium housing with Monocrystalline Solar PV Panel of 75W(-0/+4W) Mono, Lithium Battery 12.8V, 42AH(BIS Certified), IP 65, High brightness W-LED(150 Lm/watt) lamp with Aluminium reflector for better light distribution, Color Temperature 6500K +500K, Microcontroller based charge controller cum driver, automatic dimming function( with PIR Motion Sensor), Dusk to Dawn Operation, suitable to working temperature: (-) 5 degree C to (+) 45degree C, Charging time 1 day and Autonomy 2 days with dimming Protections: Short Circuit, overload, Reverse polarity and battery protections complete all as specified and directed
Road Safety Improvement Works for 2 corridors covering 35.65km in Tamil Nadu SH219 and SH162
Proving and fixing Solar powered Traffic Blinkers of 30cm dia with Polycarbonate Dome 5mm Red of Led 150 Nos. iri each Red Blinkers Light - 1 No. with Red / White / Blue Led Blinkers Delineator Solar Panel : 12v 50w Solar Panel — 1 No. 12v 18 AH Battery -1 No. with Box, Solar Circuit Controller Board Box. Straight Pole : MS Pole 3” dia 2.5mm thick 18 Feet height pole (1 No.) with 2 Feet under ground pole foundation, pole painting including transportationcharges, installation charges etc., complete as per standard specification.
Drilling and Installation of 150 x 100 mm dia .new Light Duty Tube Well solar as Kantipur LDTW cluster (6 nos) at Bijur and Kantipur mouza in JL no 12 and 15 on plot no .73 and 214,93,448, 158, 250
a) Lighting System at Scheme: (with lighting Pole) : Dusk to dawn lighting arrangement of at 4 mts height above ground level, with Hot dip galvanised 80 mm x 50 mm , medium duty pipe, with 12 V, 15Ah 2-in-1 Lithium ion/ Ferro- Phosphate battery with in-built 7-11watt LED lamp , 50 Wp solar panel to cover the scheme area. The lighting system should be warranted for 5years from the date of installation.
Construction of New Mamlatdar Office (Rural) & Mamlatdar Office (City) at Nadiad (District Kheda)
Grid Tied Solar Power Plant with Solar Panels (ALMM approved):
SPECIAL REPAIR TO BITUMINOUS ROAD AT A PARK B PARK AND ARSENAL AREA OF CAFVD KHADKI UNDER GE CENTRAL KHADKI
S & F in repairs solar stud made out of Aluminium housing and precast construction solar powered monocrystal solar panel 2W 120mA type of battery NI-CD 1.2V 2500 m AH & flash rate 2 Hz or 70 Hz view distance over 300 mtr fitted with 2 Hz EL -805-3 pieces eacg side on 2 ends total 6 pieces LEDs flashing up to 12 hours of light at Night and solar batter automatically charge in day /sun light duly fixed with cement and hardner. 125 x 125 x 25 mm (60 mm shank) in Red / Yellow colours complete all as specified and directed by Engr-in-Charge. Make (ALCOLITE/SOLAR/SIMPSON/EL 805A/ALEXIX/ 1901/DIGTMAX/TATA BP/GREENLITE
Construction of Type B and C Flat at Fisheries Campus Doranda, Ranchi
Supply, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- a) Solar Photovoltaic Module of capacity 500 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency. c) Data Monitoring System complete with accessories. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required.