Loading…
Loading…
1,303 results • Best match
Design, Supply, Installation, Testing and Commissioning of Hybrid Run (Grid Solar) single stage/ Multi stage Split case/Centrifugal Pump coupled with squirrel cage Induction motor with Hybrid motor starter, SPV Panels and Rising main and its allied
Design supply testing and commissioning of Hybrid (Grid+Solar) control panel with 200Hp soft Starter Control panel with one Incomer and two out goings for two pump sets in parallel Operation. (One running and the other standby and vice versa (both on Grid + Solar) 200 HP Soft-Starter for each pump set. fixed type, floor mounted, cubical design motor control panel fabricated out of 2mm/14 SWG CRCA thick sheet duly painted, suitable for indoor use, internally wired complete with bus bar covered with PVC heat shrinkable sleeves, colour coded. Panel shall be fitted with 02 Nos. Soft Starter motor starters suitable for 3-phase, 415 Volts, 50 Hz Squirrel Cage Induction Motors, with all components of suitable rating fixed and wired in the panel. The panel shall be complete with all protections in-built (Over load/PTC/Line fault / Voltage imbalance / Phase reversal / Under voltage / Over voltage / Over temperature / Open Gate / Excessive Starts per Hr, Single phasing), Main incoming MDO ACB 300A with short circuit release including earth fault and under voltage protection. Bus bar, metering ( incoming and outgoing Voltmeter, Ampere meter, Frequency meter) (3-phase current/3-phase voltage/power factor of running motor, phase indication lamp (RYB with CTs), Outgoing ….. A ACB with 250 HP Soft starter for each pump sets, capacitor Bank 250KVAR for an improved power factor of .95 to 1, over load relays. The control panel shall be complete with single core copper cable of size 240 mm2 of 200 RMT confirming to IS 694 with required thimbles from LT transformer to Panel and 3 ½ core Al Cable of 40 RMT of current rating more than …… Ampere. Parts Catalog-01No The Soft starter component shall be at the bottom part of the panel so that the motor connection cable length is minimized.
REPAIR/REPLACEMENT OF UNSERVICEABLE STREET LIGHTS, SOLAR LIGHTS AND MAINTENANCE OF INTERNAL WIRING, LED LIGHTS AND MISC WORKS AT NAD SUNABEDA UNDER GARRISON ENGINEER (P) (NAVY) VISAKHAPATNAM
S&F in repairs 24Watt LED solar street light fitting fixed to existing pole complete all as specified and directed. (Make: CG/Surya /Bajaj / Philips / Havells)
Custom Bid for Services - Provision of Boundary Wall for New HSD Pump at DG Plant Similar Category Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power Plant Service
Commissioning and Maintenance of Grid Connected Roof Top Solar Power Plant Service
SURVEY,DESIGN, FABRICATION,SUPPLY, INSTALLATION,TESTING AND COMMISSIONING OF 17KW GRID CONNECTED SOLAR PLANT WITH NET METERING AND 06 N0 SOLAR STREET LIGHTS AT RURAL SELF EMPLOYMENT TRAINING INSTITUTE, BABUPETH OF DISTRICT CHANDRAPUR WITH 5YEARS CMC
TOTAL 17 KW GRID CONNECTED SOLAR PV POWER PLANT AND 06 N0S. SOLAR STREET LIGHTS AT RURAL SELF EMPLOYMENT TRAINING INSTITUTE, BABUPETH OF DISTRICT CHANDRAPUR
REPAIRS OF STREET LIGHTS FLOOD LIGHTS AND SOLAR LIGHTS AND REPAIRS REPLACEMENT OF HIGH BAY LIGHTS HANGAR DOOR MOTORS AND CONNECTED ITEMS OF HANGAR INCLUDING ANNEXE AT INS RAJALI ARAKKONAM
Taking down old / unserviceable / burnt LED light fittings / drive/ignator of any type / wattage from existing positions in Hangars at height upto 30 meter including necessary Boom lift / crane etc as per site requirement carefully, checking of fitting, dismantling unserviceable / burnt parts and replacement of parts as per requirement and refixing in the location in hangar as directed complete all as specified and directed by Engr-in-charge. Note - 1) Spare parts as required shall be arranged by the Deptt from Fitting manufacturer's aganist their warranty of fittings with Deptt, However if any replacement of minor burnt wires require , the same shall be included in the rate quoted. (2) Light fitting including High Bay Light, Aviation light, flood light etc.
Re-instatement of system at 10MW Ground Mounted Solar Photovoltaic Power Plant (SPVPP) at Ranigunj under Paschim Bardhaman Regional Office, WBSEDCL