Loading…
Loading…
1,305 results • Best match
PROVISION OF 800 KW SOLAR POWER PLANT NEAR TITHWAL GATE OF SANSAR CHAND VIHAR UNDER GE (UTILITIES) UDHAMPUR
Note:- (i) Design shall be done as per latest IS code, latest MNRE guidelines and as specified in tender. Design shall be vetted by Minisry of New and Renewable Energy (MNRE) approved firms eligible for making of DPR of Solar Project. String Combination box, ACDB, DCDB, overall inverter and transformer etc Capacity shall not be less than the installed capacity of panels. Panel minimum Capacity shall be 545 Wp & efficiency not less than 20% conforming to standard applicable as per MNRE. Capacity Utilization Factor (CUF) of solar plant as per MNRE guidelines at Energy meter level shall be approved by the department at the time of design approval. (ii) Solar Modules and solar cells therein should be of make Made in India and complying DCR norms(Domestic content requirement). The contractor will have to submit company declaration in the format, to be provided by GE at the time of request for approval of sample/Make for modules. Each PV module used in this work shall have RF Identification tag. Contractor shall provide one RFID card Reader along with panels. (Contd.../)
PROVISION OF ROOF TOP SOLAR POWER PLANT AT 116 TA PARA UNDER THE AOR OF GE DEVLALI
Supply, Installation & Erection of suitable height as directed by engineer-in- charge module mounting structure with required accessories for panel mounting [ Material : Hot - dip galvanized mild steel (minimum 80um zinc coating ] suitable for 45 KW roof top solar power plant. Column & Rafters with digging, cementing and panel laying, (STADD PRO - 180KMPH WIND), structure standard for solar panels. Structure shall be mounted using RCC/ PCC blocks. MS mounting structures may be used for mounting of solarpanels . Each structure should have angle of inclination as per site conditions to make maximum insolaltion. Including structure with suitable ladder, walkway & including water pipelines, fittings, Jet Valves & pump of suitable capacity with electric cable and connection complete for cleaning of solar panels with accessories Structure must have MS Chequered plate, 600mm width, load capacity 150 Kg/m2 & Ladder. GI /MS, 450mm width with handrails. It has to follow IS safety standards
Installation of tube well with solar submersible pump near community hall at Karamara
Installation of tube well with solar submersible pump near community hall at Karamara
Installation of Solar pump with water tank at Jajigram GP Office . WC 111122652, Fund 15th CFC
Installation of Solar pump with water tank at Jajigram GP Office , W/C 111122652, Fund:-15th CFC
Construction of 400 Bedded boys Hostel Building at JIPMER Campus, Puducherry. (Civil Work): Building portion including internal water supply lines, Sanitary Installation, drainage, demolition of existing quarters & other development works. ... LPD Solar Water ... Solar Water Heater, ... Water Heater , ...
Request for Selection (RfS) Document for Selection of Solar Power Developers for Setting up of Grid-Connected Solar PV Projects with Battery Energy Storage System (BESS) in Lakshadweep Through Tariff Based Competitive Bidding
Tariff for Design, Engineering, Supply, Installation, Testing, Commissioning, Operation and Maintenance of Solar Power Plant (13.5MW)+Wind Power Plant (1500KW)+ BESS (48.52MWh) for Kavaratti Island for a period of 25Years