Loading…
Loading…
1,270 results • Best match
COMPREHENSIVE MAINTENANCE AND MANNING, OPERATION FOR SPV SOLAR POWER PLANT OF CAPACITY 4MW AND 2MW AND CONNECTED WORKS AT ARMY AREA JODHPUR UNDER GE (ARMY) NO. 01
(i) Automatic morning wake-up and nightly shutdown. (ii) Mains (Grid ) over-under voltage and frequency protection. (iii) Galvanic isolation and full proof protection against ISLANDING . (iv) Included authentic tracking of the solar arrays maximum power operation voltage (MPPT). (v) Array ground fault detection. (vi) LCD and Piezoelectric keypad operator interface Menu driven. (vii) Automatic fault condtions reset for all parameter like voltage, frequency and /or black out. (viii) MOV type surge arrester on AC and DC terminals for over voltage ptotection from lightning -induced surges. (ix) Provision for input and output isolation. (x) Inverter shall be installed on GI stand made by the angle size 50mm x 50mm x 6mm. Structure burried in ground and shall be 450mm above ground level. Grid Connectivity: Relevant CERC/RERC regulations and grid code as amended and revised from time to time shall be complied. Inverter shall adjust the voltage & frequency levels to suit the Grid.complete all as specified and directed by Engr-in-Charge.
Under the Vikash block Karchhna, in Rampur, teshil Mungari, near Rampur market, the work of installation of a water solar pump lot-14
Supply and Installation of Solar Energy Based Pumping System complete with design,Supply,Installation & commissioning with 1000 ltr water Tank (As per market Rate)
Under the development block Karchhna, the work of installation of a water solar pump near Shayar Mata Temple in Devari Kala lot-23
Supply and Installation of Solar Energy Based Pumping System complete with design,Supply,Installation & commissioning with 1000 ltr water Tank (As per market Rate)
Under the Vikas Khand Karchna, in Devari Kala, the work of installing a water solar pump near Piperan settlement Amrit Sarovar lot-3
Supply and Installation of Solar Energy Based Pumping System complete with design,Supply,Installation & commissioning with 1000 ltr water Tank (As per market Rate)
Construction of 400 Bedded Boys Hostel Building at JIPMER Campus, Pducherry. (civil Work): Building portion including internal water supply lines, Sanitary Installation, Dramage , Demolition of existing quarters & other development works. (electrical ... LPD Solar Water ... Solar Water Heater, ... Water Heater , ...
Custom Bid for Services - Carrying out EPC package of Development of BESS in TLCMP Township along with OandM Similar Category Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power Plant Service
Commissioning and Maintenance of Grid Connected Roof Top Solar Power Plant Service