Loading…
Loading…
1,288 results • Best match
SPECIAL REPAIR TO BITUMINOUS ROAD AT A PARK B PARK AND ARSENAL AREA OF CAFVD KHADKI UNDER GE CENTRAL KHADKI
S & F in repairs solar stud made out of Aluminium housing and precast construction solar powered monocrystal solar panel 2W 120mA type of battery NI-CD 1.2V 2500 m AH & flash rate 2 Hz or 70 Hz view distance over 300 mtr fitted with 2 Hz EL -805-3 pieces eacg side on 2 ends total 6 pieces LEDs flashing up to 12 hours of light at Night and solar batter automatically charge in day /sun light duly fixed with cement and hardner. 125 x 125 x 25 mm (60 mm shank) in Red / Yellow colours complete all as specified and directed by Engr-in-Charge. Make (ALCOLITE/SOLAR/SIMPSON/EL 805A/ALEXIX/ 1901/DIGTMAX/TATA BP/GREENLITE
Construction of Type B and C Flat at Fisheries Campus Doranda, Ranchi
Supply, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- a) Solar Photovoltaic Module of capacity 500 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency. c) Data Monitoring System complete with accessories. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required.
8237/E8
Supply and fixing LED Solar street light fitting 36 Watt including galvanized steel pole in built, lithium ion battery, solar panel, charge controller with dusk down sensor complete. (Excavation &earth work shall be measured separately)
DEMOLITION OF EXISTING GSR, PUMP HOUSE AND CONSTRUCTION OF NEW GSR, PUMP HOUSE, WITH NECESSARY COMPONENTS AT CHANNI JAKATNAKA WATER HEAD WORK, VADODARA.
Power Plant with Solar Panels (ALMM approved): Frame Material : Anodized
DEMOLITION OF EXISTING GSR, PUMP HOUSE AND CONSTRUCTION OF NEW GSR, PUMP HOUSE, WITH NECESSARY COMPONENTS AT CHANNI JAKATNAKA WATER HEAD WORK, VADODARA.
Power Plant with Solar Panels (ALMM approved): Frame Material : Anodized
Construction, Commissioning of Faecal Sludge Treatment Plant of Capacity 10 KLD at Hariharganj Nagar Panchayat, Jharkhand and Operation and Maintenance for 5 years
Solar Based Street Light of Following Specification Semi Integrated Solar Street Light 30 W Battery Type Lithium Ion 11.1V 24ah Solar Panel 12V 60W LED Chip Brand Osram Led Life Time Over 5000 hours Charging Time 5 – 6 hours Lumen 3500 – 3700 Lighting Viewing Angle 120° Backup Time 1 – 2 Days