Loading…
Loading…
1,423 results • Best match
PROVN OF INFRASTRUCTURE FOR AGNIVEER AT 1 EME CENTRE UNDER GE (NORTH) SECUNDERABAD
Lumpsum price worked out by the tenderer for as listed in Schedule ‘A’ SOLAR WATER HEATER Part-XI
ENGINEERING PROCUREMENT AND CONSTRUCTION (EPC) OF OTM ACCOMMODATION UNDER GE (C) KHADKI
Supply and fixing of Elegant look LED Solar light fitting 40 W AIO LED Solar Street lights having extruded aluminium housing, 100 Wp or more Mono Crystalline Panel/Laminates ((Made in India) fixed on the top of the Luminaire housing, maintenance free 12.8 volts 36 Ah or more LiFeP04 battery(BIS certified) , BMS, MPPT charge controller, PIR sensor to provide 2 days (24 hrs ) back up in dimming mode. The luminaire is having IP 65 protection for critical components, IK 07 and having lumen output of > 6400 lm as per LM 79 report of third party NABL lab . The lumen efficacy should be > 160 lm/w and the maximum wattage of the AIO street light luminaire shall not be more than 40 W to deliver 6400 lm Both the luminaire and Mono Crystalline Panel must be manufactured in India. The Solar lighting company must submit the third party NABL lab reports t~ justify the Lum~n efficacy, luminaire output , IK 07 and IP 65 protection ( In house NABL lab reports will not be acceptable). The complete Solar lighting system must be warrantied for a period of 5 years . The Solar lighting companies must be having toll free base service network to provide immediate after sales service through their service network available in different districts of the state .The Solar lighting companies should submit the lighting design report prepared by their in house lighting design team if required as per the direction of engineer in charge. Lenses should be provided for effective distribution of light on the ground .The AIO solar street lights shall be of Anchor by Panasonic make PA040W11 MLF2401 or equivalent in Philips/Crompton/Havells.
Construction Work of Garbage Vulnerable Points Development as Per Various Location Chart. At, Palitana. Under Nirmal Gujarat -2 Year-2025-26. (Fourth Attempt)
Supplying and erecting LED Solar street lights with High power White
Hyderabad Division: 1:Provision of CCTV cameras at 9 MMTS stations (ie,. LGDH DYE, SFX, RKO, AMQ, ALW, BOZ, GWV and NSVP) over Hyderabad Division, 2)Provision of Video Surveillance at Different Locations at Railway Stations and Provision of Video Recording at Relay Room/Station Master Room Provision of Video Recording System in 67 Relay Room, 67 Station Master Room over Hyderabad Division. 3)Provision of CCTV Surveillance System at 17 Goods Sheds - Telecom arrangments. 4)Hyderabad Division-:Provision of Intrusion detection system at vulnerable locations of HYB Division
Supply and installation of 70W Solar Panel,Battery Charger Kit,Camera Numbers Mount Bracket,Solar Panel Mount Bracket,100 Ah Battery Housing Kit,12V/100Ah SMF Battery. (INSPECTION : CONSIGNEE )
CA NO. GE AF NO.1/GUR-03/2026-27 SPECIAL REPAIRS TO ROOF TREATMENT AND CONNECTED WORKS IN BUILDING NO-P-144 TO P-153 AT SEKHON VIHAR UNDER GE (AF) GURGAON NO 1
Dismantling of existing roof Treatment including Taking down of roof plaster of any description all as specified and as directed by Engr-in charge.Rate of this item is inclusive of disconnect fitment of solar water tank or solar Panel ,any type of cable ,Pipes etc and refixing in the same position after completing of roof treatment.complete all as specified and directed by Engineer-in-Charge..complete all as specified and directed by Engineer-in-Charge.
Construction of seven storey boys hostel no.9 (ground floor to 6th floor) in PU South Campus Sector 25 Chandigarh
a) High Energy Efficiency Solar Photovoltaic Module of capacity 330 Wp or above, manufactured in India, conforming to IS14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 23% at STC with temperature coefficient of Pmax better than -0.30% per degree Celsius. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. Solar Modules shall be designed to operate in relative humidity upto 100% with temperature between -10 Deg C and +85 Deg C. Further, each PV module used in any solar power project must have Radio frequency identification tag with information such as name of manufacturer, month and year of manufacturing, country of origin (separately for Solar cell and module), I-V curve, Unique Serial No and Model No of the module, Wattage, Im, Vm and FF, name of test lab issuing IEC certificate.