Loading…
Loading…
1,426 results • Best match
Reclamation of waterlogged Land and Saline Soil throughVertical Drainage Project in the villages Makrouli Kalan Makrouli Khurd Rurkee(Block-Rohtak) and Bharan (Block-Meham) District-Rohtak
7.5 HP DC SUBMERSIBLE SOLAR PUMP WITH NORMAL CONTROLLER AS PER HAREDA GUIDELINES RATES ARE WITH OUT GST
Reclamation of Waterlogged Land and Saline Soil through Vertical Drainage Technology Projects in the Village Madina Korsan and Madina Gindhran
7.5 HP DC SUBMERSIBLE SOLAR PUMP WITH NORMAL CONTROLLER AS PER HAREDA GUIDELINES RATES ARE WITH OUT GST
CONSTRUCTION OF RIVERSIDE SAVORIESI.E. BUILDING WITH UNDERGROUND ROAD BETWEEN NEHRU BRIDGE AND ELLISBRIDGE AND CONSTRUCTION OF PUBLIC PLAZA AND UNDERGROUND PARKING FACILITY AT SANSKAR KENDRA - TAGORE HALL CAMPUS CONNECTING RIVERFRONT ON WESTBANK FOR SRFDCL.
Supply, Installation, Testing & Commissioning of following size of Grid Tied Solar Power Plant with 150 PER KW 42035 63,05,250.00
REPAIR REPLACEMENT OF INTERNAL UNSERVICEABLE POINT WIRING FITTING FIXTURE AND CONNECTED ACCESSORIES WORK IN KARAM SINGH ENCLAVE AND BANA SINGH ENCLAVE UNDER AGE EM IV OF GE (SOUTH) BATHINDA AT BATHINDA MIL STN
Material and labour for Disconnecting, dismantling of solar water heating system of any capacity /make incl all water and electric connection and re-fixing the same in existing position after the following repairs and testing complete all as specified and as directed :- (a) Replacement of the worn out/missing nuts bolts, washers, unions, sockets flanges and screw, nipple, tee, elbow, dead plug, etc complete. (b) Descaling/de- sludging the hot water pipes and normal water by using appropriate chemicals/Anti corrosive/Anti scaling agent solution, cleaning and washing all copper tube & water circulated pipes of heat convertor sets thoroughly cleaning the complete solar panel of making the tube scale free and reassembling the panel. (c) Cleaning hot and cold water tanks, removing sludge and scale from the tank manually using suitable chemicals complete. (d) Repair of collector fins incl required welding works etc complete. (e) Testing on completion after Repair work and making the Solar Water Heater functional in each aspects. Note:- The cosumable items if required on site will be scope ot the contractor.
Bulbs Tubes and Fitting etc
Supply of Halonixs/Surya/Philips make LED Solar Street Light 2 IN 1 Led Watt 25 W, Battery 12.8, 30 AH PIO4 battery, Pannel 75W MNRE Approved, Lumens 120 Lm/W, Optical Lens, Warrenty 3 Year
SPECIAL REPAIR TO MANGAL PANDEY ROAD FROM STN CHOWK TO SADAR FLY OVER UNDER AGE B/R-II GE (WEST) LUCKNOW.
Supply and fixing aluminium-alloy body Solar stud with following specification :- (a) Solar panel Mono-Crystalline Solar 2.4V/0.3 Watt and having charging capacity at a very low sunlight. (b) Red colour Six Super Bright LEDs with 10000 to 18000 mcd (Millicandela) 8 mm fitted at appropriate height for clear blinking point. (c) 1.2V Ni-MH or Ni-CD rechargeable battery capacity 1300 mAh. LSD (Low Self Discharge technology) fitted inside solar stud. (d) Working time 3 to 4 days successively after the battery is fully charged. (e) Charging time for full charge One full sunny day. (f) Working temperature : 10 to 75 Degree Celcius. (g) Flash rate : 60 to 70 times per minute normally. (h) Brightness sensitive auto-switch, automatically turns on at dusk and turns off at dawn to ensure easy and safe night driving. (j) High visibility LEDs help ensure easy and and safe night driving from a distance of 1000-1100 Meters approx. (k) Solar stud should be free of maintenance and operational in all weather conditions. (i) The PCB board and solar panel should be sealed in Poly Carbonate case for extra waterproofing and high/low temperature protection. The logo of the manufacturer should be embossed on front side of the body to ensure genuinesess. Dimension/Size of the Solar Std should be 125 mmx125mmx25 mm body, with shank height 65 mm (Total height 90 mm including shank) (m) Weight of the Solar Stud should be 650 Gram approx. (n) Minimum 150 gram of a special epoxy chemical should be used per pcs to fix the stud on the road surface.