Loading…
Loading…
1,436 results • Best match
SPL REPAIR OF ROADS OF OFFRS MD ACCN AT BAIRAGARH UNDER GE BHOPAL
Supply and fix in repair solar stud aluminum alloy shall (100% water proofing design according to 65) of size 125mm x 125mm x 25mm (shank 65mm) of high efficiency Mono rystafie solar panel 2.4V/ 0.3 watt one NI-ed rechargeable battery (1.2V/ 1600MA) consisting of super bright LED with10,000 to 18,000 mcd completed as per manufactures instructions etc. complete all as specified and directed.
SPECIAL REPAIR TO ROAD (WKSP MAIN RD AND OPEN PARKING AREA) FOR APPROX 3300 SQM AT FD WKSP COY AND INTERNAL ROAD OF DOU UNDER GE MISSAMARI
S&F in repair solar cat eye aluminium alloy shall (100% water proofing design according to 65) of size (125 mm x 125 mm x 25 mm) (shank 65 mm) of high effciency Mono rystafie solar panel 2.4 V/0.3 watt one NI-ed rechargeable battery (1.2V/1600 MA) consisting of super bright LED with 10,000 to 18,000 mcd completed as per manufactures instructions aii as specified and directed.
Annual Mechanical Framework Contract of Tube Well Irrigation Schemes of Mechanical Irrigation Construction Division Srinagar
LED Lantern with Twin Charging mode – Charging Cable & Solar Panel (included) (Syska/ Havells/ Andslite/ Philips/ Bajaj)
CONSTRUCTION MULTIPURPOSE BUILDING OF PRESS DEHRADUN AT DEHRADUN UTTARAKHAND
Supply, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant of conforming to MNRE specifications as amended, consisting of ALMM Alisted DCR Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- a) Solar Photovoltaic Module of capacity 540 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PCU) of 180-1000 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 98%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency. c) Data Monitoring System complete with accessories. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required.outgoing cable along with glands, lugs and other accessories etc. as required.
CA NO. GE AF NO.1 / GUR-40 / 2026-27 REPAIR/ MAINT OF SOLAR HEATERS, ELECTRIC GEYSERS AND OTHER CONNECTED ITEMS AT SEKHON VIHAR UNDER GE(AF) GURGAON NO 01
Servicing of Solar Water Systems by pouring the anti-corrosion/anti scaling agent solution in the make up tank to clear the water circulated pipes of heat convertors sets upto six solar panels of capacity 1000 LPD and drain out the solution by opening the nuts and bolts of dead plugs placed at the end of the system and make the system serviceable as per site requirement
As per TD
Supply, installation, testing and commissioning of MNRE approved Grid tied Solar Panels with inverter, meter, cable etc. suitable for Rooftop installation as well as Utility Scale Solar Power Projects with 25 years of Linear Generation warranty. Work includes designing of solar panel area and MS frame and foundation on ground/roof of Pump house or CWR, showing arrangement of panel in available space, installation of PV module on MS frame as per approved design and drawings. Mounting structure shall be suitably designed to withstand wind velocity up to 150km/hr. Grid Tie Transformer less inverters, Multiple independent MPPTs, Peak efficiency of >98%. Connect up to multiple strings PV arrays, Easy & fast connection, Built-in string-level monitoring, IP65 protection level, Wi-Fi / internet based remote monitoring with 5 years warranty. All cabling up to panel and metre, earthing etc. required accessories and taxes are inclusive. The work shall be executed as per detailed technical specifications, approved drawing and direction of Engineer in Charge. Note: There shall be 5 year service warranty for panel, inverter, meter, cable etc. and suitable provision shall be included in tender document.