Loading…
Loading…
1,430 results • Best match
SHORT TERM MAINTENANCE CONTRACT STMC FOR KM 92/400 TO 127/350 OF NH-248A (HANUMAN CIRCLE TO NAUGAON SECTION) IN THE STATE OF RAJASTHAN (JOB NO. RW/JAI/STMC/ 2026-27/NH-248A/01)
SITC of Crystal control Road warning Blinker system with solar panel module with 300mm LED Module of minimum 190 Nos., Blinker Units, Charging circuit, suitable SMF Rechargeable Battery (12 Volt,), including wiring, connections etc. complete in all respect
Construction of Wellness Centre along with High End Fountain at Nagrota Bagwan, District Kangra, Himachal Pradesh
Solar Panel System:- SITC of 25KW Solar Power Plant Havells make including Solar PV Modules 540Wp (mono type): 47 Nos, Solar Grid Tie Inverter 25KW: 1 Nos., DCDB (DC Safety unit -Supply of DCDB (DC- Safety unit) with Fuses & DC SPD class-1 Nos, AC Distribution Box: Main AC Distribution Box complete with 1 Nos. Class I + II Surge Protective Device with CT & Multifunction Meter & required MCCB/MCB, Cables as per site: From PV Module To LT Panel: 1 C X 4 / 6 Sq mm Solar cable (Module to DCDB), 3.5 C X 6 Sq mm cu wire (ACDB to LT Panel), Required Earthing System: Module Earthing, Inverter & LA earthing, Conduits / Cable Tray: Conduit Pipes, Cable trays, RJ-45 connector as per the site condition, complete in all respect, including all accessory, mounting structure of suitable size including carriage of materials up to all lead and lift and as per direction of Engineer in charge. As required (Havells/Luminous/Tata or equivalent.
Miyawaki Plantation 1 No. and Pasture Development work 2 No under PMKSY-2.0 , XEn WDSC Block Khandela, Sikar
Supply, Installation, Testing and Commissioning of different different capacity Solar Powered Water Pumps with complete assembly of Solar Modules, controller, Solar motors, including transportation, loweing and fixing with the SPV module, controller and providing pipe connections on suction and delivery sides, of approved make and specifications laid down and updated time to time by MNRE, complete in all respect, Surface Pumps (Non Bsr Item ) 2 HP
REPAIR/REPLACEMENT TO TRUSSES, ROOF SHEETING AND CERTAIN B/R WORKS IN X AREA AT AFS AMLA
Supply and fix in repairs high proformence industrial circulator/ ventilator wind driven turbine dia of bottom ring 600 mm Top plate and bottom ring made of stainless steel with FRP base to match roofing sheet with polyster rasin powder coated top of the ventilator turbine made of aluminium with integrated and reinforced main bearing housing the shaft of stainless steel and varplitch from aluminium rotation bearing made of twin ZZ ball bearing encased in single integrated bearing and housing etc complete all as specified and directed.
Construction of State Environment Impact and Assessment Authority (SEIAA) at plot no. IP8 Sector 5B, MDC, Panchkula Construction of State Environment Impact and Assessment Authority (SEIAA) at plot no. IP8 Sector 5B, MDC, Panchkula
SOLAR PANELS Supply Installation testing commissioning of Solar Photovoltaic grid connected roof top Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- (a) Solar Photovoltaic Module manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. (b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz plus /- 2.5 Hz, output voltage suitable to generate AC (c) Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degrees C. The PCU shall adjust the voltage and frequency level to suit grid frequency (d) Data Monitoring System complete with accessories. (e) Fixing of Array junction box and Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. (f) Lightning and surge voltage protection. (g) Connections and Interconnections by supplying and fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying and fixing of necessary channel/conduit lugs and other accessories etc. as required. 2. Above 10 kWp and up to 100 Kwp (HSR 32.70.2)
Construction of 150 bedded Vishram Sadan at GGH Hospital in Kurnool, Andhra Pradesh under CSR initiative by Ms POWERGRID
16.5%. PV modules used in solar power plants/systems must be warranted