Loading…
Loading…
1,462 results • Best match
CALL FOR ALL Types of Building Materials
Solar Street Light Installation Charge Per Light
PROVN OF OTM ACCN OF FD HOSP AT SAUGOR MIL STN
Note:- (i) Makes of panel provided shall be as per MNRE specification/ standard and registered in ALMM. (ii) 5% spare qty of modules shall be provided by the contractor for repair / replacement purpose. (iii) Addln module shall be provided / installed by the contractor to meet specified power output incase if the same not achived during testing and commissioning without any extra cost. (iv) Each PV module used in any solar power project must use a RF identification tag. The following information must be mentioned in the RFID used on each module:- (v) Name of the manufacturer of PV Module (vi) Name of the Manufacturer of Solar cells (vii) Month and year of the manufacture for solar cells and the module (viii) Country of origin (Make in INDIA only) (ix) I-Vcurve for the module (x) Wattage, Im, Vm and FF for the module (xi) Unique Serial No and Model No of the module (xii) Date and year of obtaining IEC PV module qualification certificate (xiii) Name of the test lab issuing EC certificate (xiv) Other relevant information on traceability of solar cells & module.
SPECIAL REPAIR OF ROADS AT MARCOS (SVP) TEYLERABAD UNDER GE MINNIEBAY, SRI VIJAYA PURAM.
S&F in repair solar cat eye (studs) of size 125mm x 125mm x 25mm (shank 65mm) of aluminium alloy have high efficiency mono-Crystalline solar panel 24.V/0.30 watt having one Ni-Mh or Ni-Cd rechargeable battery (1.2v/1600MA). Six super bright LEDs with 10,000 to 18,000 mcd (Mil Candela) having flash rate 2 Hz and bearable weight 10 tons approx with view distance upto 1,000 meters of any colour i.e yellow, red, blue, green or white as required at site working temp 10-50 degree celcius, working time 3 to 4 days after fullly charged battery, charging time 5 to 6 hrs from direct sun light maintenance free, unbreakable, poly carbonate clear facing, automatically turn on at night and tum off at day incluinding all fixing arrangements as per manufacturer's instuctions comple all as specified and as directd.
Construction of Govt ITI Building G plus 5 Centre of Excellence at Nangal Distt Ropar
Supply, Installation, testing & Commissioing of Grid interactive PV System Solar Power Plant (i.e connected to utility grid) of Minimum 35KWp including required quantities of SPV modules (High power density Monocrystalline based single module iof capacity+550W) formed into arrays, their mounting arrangement, Power conditioning units (i.e String Solar Inverter), required DC & AC distribution panels with surge protection units, cabling from terrace to main distribution board through Cable tray, Bi Directional Energy Meter, Chemical copper bonded rods (i.e. 1 Nos. GI Structure, 2Nos. for String Inverter, AC & DC Distribution System)Provsion of Lighting arrester and 2 Nos. G.I. chemical earthing with copper bonded rods. Hot Dip Galvanized MS Mounting Structure be Designed to with stand the Speed for the Wind Zone of the Location(Rated Wind Speed 150-170Kph) Complete with transportaion, fabrication, labour & Civil Work.
COMPLETION OF BALANCE WORK AGAINST PROVN OF KLP AT SAMBA
Supply and installing standalone dimmable solar street LED light with 3150 lumen , 30 Watt system wattage 120 WP panel, 100 AH battery ,12 V system, mounted on 5 mtrs Steel tabular pole, metal battery box ,with all acessories MPPT based charge controller standards : EN50530 for MPPT performance ,solar panel : IEC 61215, Electronics ,EN50530 : MPPT performance evaluation ,IEC 62124: solar standalone system performance , IEC 61347-2-13 : LED driver safety,IEC 62384 : LED driver performance ,CISPR 15 : Radio disturbance characteristics , IEC 61547 : EMC immunity requirements ,IEC60598 General requirments and tests, with overcharge protection for battery,with deep discharge protection for battery, with reverse polarity protection for panel and battery with temperature compensated charging for battery, with dimming at 50 % after 6 Hrs , Integrated MPPT charger +Driver +Bluetooth complete all as specified and directed by Engr-in- Charge. Make: Havells Cat Part No LHEWEBP7PL6S030 & Phillips Cat part : BRP409 30 W or equivalent in Bajaj.
Development of Koraput Culture Centre, Koraput.
Supply Installation Testing and Commissioning of on grid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono PERC HALF CUT bifacial Crystalline silicon solar cells, net metering facility ,necessary protections, earthing, mounted on hot dip GI structure( solar panel bottom height from roof level shall not be less than 300mm, accordingly GI structure to be designed) of suitable strength with following components a complete as arequired: a) Solar Photovoltaic Module of capacity 545Wp or above, manufactured in India, conforming to IS14286 / IEC61215, IS/IEC61730 Part 1,IS/IEC61730 Part 2. Solar Photovoltaic Module conversion efficiency shall not be less than 22%. PV modules used in solar power plants /systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PCU) of 350 800 V DC Input voltage range and 400 V AC, three phase , 4 wire, 50Hz +/ 2.5Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree Celcious. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage,frequency. c) Data Monitoring System complete with accessories.d)Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugsand other accessories etc. asarequired.e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/ conduit lugs and other accessories etc. asrequired. with all required accessories as required as per the direction of Engg in charge.Make Tata/waree/luminous/adani/panasonic. The entire SOLAR system should be Replacement Warranty will be 5 years