Loading…
Loading…
1,476 results • Best match
Mukhyamantri Border Village Sarvangi Utkarsh Scheme 2025-26 Construction of Science Lab Building in Primary School at village Anandpur Ta.Uchchhal Dist.Tapi.
Composting model, Solar water pump model,
Mukhyamantri Border Village Sarvangi Utkarsh Scheme 2025-26 Construction of Science Lab Building in Primary School at village Mataval Ta.Kukarmunda Dist.Tapi.
Composting model, Solar water pump model,
Construction of Madaveedhulu around Bhadrakali Temple, Hanumakonda (South-West side) Phase-II
GYSER-Supplying, installation,testing and comiisioning of solar hot water heater comprising of solar FLAT Plate Collector(FPC) of size 2120x1040x100mm or equivalent size and stainless steel hot water storage tank with stainless steel heat exchnager absorber made of copper sheet and copper tibe of following capacity aluminium box collector with appropriate capacity electrical back up arrangement exckuding inlet aand outlet pipes.SS Model with 100mm thick of 48Kg/M3 dc Rock wool insulation with 22 SWG Aluminium cladding - 100litre Make : Racold / Solarizer / V-Guard
Construction of 28M X 10M (G plus 1 with Mezzanine) control building at Siliguri Terminal
COCO, Standard drawing No. ENG/IOCL/PDIL-1. List of Componets are: (a) 1 No. MCCB (3P+N) of 160 A, 35 KA with O/L, E/F & S/C Releases for incomer from Electricity Board (b) AC Digital Voltmeter (0-500V) with built in selector switch for incomer from Electricty Board (c) AC Digital Ammeter (0-150A) with built in selector switch for incomer from Electricity Board (d) 1 No. FP, On Load, 160 A, Manually Operated Change over switch suitable for connection of Mains supply and 75 KVA DG Set /10 KW Solar system with required No. of MCCB (160 A, 35 KA, 3P+N) for change over between Mains supply and DG Set /Solar Supply along with 2 Nos 6A , SP, Control MCB with Indicating lamps. (e) 1 No. MCCB (3P+N) of 160A, 35 KA with UV coil O/L , E/F & S/C Releases for incomer from Electricity Board/DG Set/ Solar Supply & 1 No 6A , SP, Control MCB with 3 Nos LED Type (RYB) Indicating lamps (f) 3 Nos 160/5 A CL1 10VA Current Transformers ; PT (50 VA) along with 2 A control fuse link and 1 No. 6A , SP, Control MCB (g) 1 No DP MCB of 40 A, 10 KA for supply of essential loads (h) 1 No Single Phase Contactor(3NO+3NC) for supply to essential loads (i) 1 No MCB DB Hosuing 6 Nos , 16 A, 10 KA DP MCB as outgoings for essential loads (j) 415 V, TP & N, 160 A, Al Bus Bar (k) 4 Nos MCB (3P+N) of 40 A,10 KA for supply of outgoing feeders 1-4. (l) 12 Nos DP MCB of 10 A, 10 KA in Outgoing Feeder -1 (m) 6 Nos DP MCB of 16 A, 10 KA & 6 Nos DP MCB 20 A, 10KA in outgoing Feeder-2 (n) 3 Nos DP MCB of 16 A, 10 KA,6 Nos DP MCB of 20A, 10 KA & 3 Nos DP MCB of 25 A, 10 KA in outgoing Feeder-3 (o) 3 Nos TP MCB of 16 A, 10 KA,3 Nos TP MCB of 20A, 10 KA & 6 Nos TP MCB of 25 A, 10 KA in outgoing Feeder-4 (p) Provision for Termination of Solar Power (Up to 10 KW) Incomer to Essential DB in Panel as per requirement of IOCL.
Construction of Commercial Complex in Scheme No. 7, Sector 12, Shastri Nagar, Budhana Road, Meerut.
SOLAR PHOTO VATALIC POWER GENERATION
O and M with AICMC of HVAC and VRV System at Varanasi
Title23 Cleaning of the solar module regularly two cycle in a month including minor repairing of Tulu pump and monitoring of 600 KWp (500KWp+100KWp)Grid Connected Roof Top Mounted Solar Photo Voltaic Power Plant by deploying minimum one number unskilled man power in general shift excluding weekly off including maintaining records as per special conditions of the contract and as per direction of E-I-C. (Consumables cleaning material like wiper duster, PVC flexible pipe etc. are to be provided by the agency. The Solar module are under warrantee whereas inverter to be maintained by OEM. The agency has to liaison with OEM for repairing/replacement of defective parts).