Loading…
Loading…
1,271 results • Best match
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) (3 (3 ))
Solar Power Plant (Roof Top) for ONGRID System
MPLADS 2025-26 of Sri. Jose K Mani MP (RS)- Supply and Installation of solar street light at Muringoor Railway Bridge in Meloor Panchayat, Ward 15.
OD393870/2025-2026 Supply and Installation of 35W All-In-One Solar Street Light system consists of 4000K-6000K CCT, greater than 105lumen/W, a minimum luminous efficacy of 110 Lm/W, and a CRI greater than 70. It operates within a temperature range of 0°C to 45°C and boasts an LED lifespan of 50000 hours. Equipped with a microwave sensor and an in-built MPPT charger within the luminaire, it provides a backup/autonomy of 2 nights. The unit includes open circuit, and short circuit, protections, along with an IP65 ingress protection rating, Class III insulation, and an IK08 rating for the lens. Powering the system is a 12.8V, 30Ah LiFePO4 battery suitable for charging by a 70W solar panel.
REPAIR/MAINTENANCE OF 1MW SOLAR POWER GENERATION PLANT AT BAMBOLIM UNDER GE PANAJI
Note:- 1. The succsesfull bidder shall rectify the defects within 30 days of acceptance of the work order in the solar power plants such that minimum capacity utlisation factor (CUF) of 15% for plants is maintained. 2. The Contractor shall ensure the plant availability upto 99%. However, the plant availability due to grid outages will be considered only if the same are certified by the competent authority/ AGE. Any other outages which are not attributable to the Contractor and are certified by Department may also be considered. 3. Linear degradation of the module output (i.e., 0.75% of DC capacity at Std temp Condition per year) shall be considered for the calculation of CUF every year. 4. The contractor shall perform periodic overhauls and preventive maintenance required for the plant. 5. In order to optimise the useful life of equipment of solar power plant , the contractor shall carry out necessary routine , breakdown and preventive maintenance. 6. The contractor shall carry out the performance monitoring for the plant facility on continuous basis and in case of any deviation contractor shall perform the due diligence appropriately to find out the actual root cause of such deviation. any test or spection required such as thermal imaging, current voltage (IV) characterstics test, PTC to analysis such deviation will be the responsibility of the contractor thereafter corrective action reuired to mitigate such deviation shall be undertaken by the the contractor without any additional cost. 7. The Contractor shall ensure minimum Capacity Utilisation Factor (CUF) as specified in the contract during the entire AMC period. 8. The Contractor shall maintain overall plant availability up to 99%, excluding certified grid outages and departmental shutdowns. 9. All breakdowns affecting generation shall be attended on priority and rectified within the stipulated time to avoid generation loss. 10. Mandatory spare parts required for uninterrupted operation of the Solar Power Plant shall be kept readily available at site at all times during AMC period. 11. The Contractor shall maintain the earthing resistance value within permissible limits. In case the earthing value exceeds specified limits, necessary recharging/replacement/new earthing shall be carried out by the Contractor at no extra cost. 12. The Contractor shall strictly comply with all applicable safety standards, IE Rules, IS Codes, statutory requirements, and departmental safety procedures during execution of maintenance works. 13. Any defective equipment/components affecting performance and efficiency of the Solar Power Plant shall be repaired/replaced by the Contractor without any additional financial implication to the Department
Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Solar Power Plant (Roof Top) for ONGRID System
Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Solar Power Plant (Roof Top) for ONGRID System
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Solar Power Plant (Roof Top) for ONGRID System