Loading…
Loading…
1,344 results • Best match
Construction of B.R. Ambedkar Bhawan in Ladwa (CM Announcement Code no. 29235 and Dated 04-12-2025)
[32.70.2]Supply Installation testing commissioning of Solar Photovoltaic grid connected roof top Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- (a) Solar Photovoltaic Module manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. (b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz plus /- 2.5 Hz, output voltage suitable to generate AC (c) Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degrees C. The PCU shall adjust the voltage and frequency level to suit grid frequency (d) Data Monitoring System complete with accessories. (e) Fixing of Array junction box and Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. (f) Lightning and surge voltage protection. (g) Connections and Interconnections by supplying and fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying and fixing of necessary channel/conduit lugs and other accessories etc. as required. 2. Above 10 kWp and up to 100 Kwp [Through Rate]
Annual Maintenance including Incident Management of Dindigul Bypass to Samayanallur Section from Km 368/147 to Km 421/196 of NH-44 (Old NH-7) in the State of Tamil Nadu on Item Rate Basis
Solar LED blinkers Supplying and erecting red /yellow unbreakable polycarbonate body Solar Blinker 300mm dia. LED lamp confirming to IRC:93 and IS:7537. It shall have Light Emitting Diode (LED) - Hi Bright technology (Compliant to EN12368 or equivalent BIS standard). The Signal Switching shall be Solid State, with Opto-isolation. The Automatic operation mode shall have functional flashing rate available at 50% Duty Cycle 50 ог 60 Flashes/minutes. The Electrical Power Supply shall be solar based 12 VDC operating at Ambient temperature 0° to 55°C. The solar power system shall have in-built charge Controller - Low/High cut out, Solar SPV Module 60 Watts, Maintenance Free Battery (60AH) (having back up for operating blinker for 72 Hrs in absence of Sun or during rainy or foggy days. The Solar System shall be housed in a weatherproof pole mounting cabinet with clamp and mounting accessories. The Solar Blinker shall be supported on Gl circular pipe 80 NB, 3.2 mm thickness confirming to IS 1239, 3m above the Finish Road level. Gl circular pipe shall be firmly fixed to the ground by means of properly designed foundation with M 25 grade cement concrete 45 cm x 45 cm x 60, 60 cm below ground level as per approved drawing. Alternate white and yellow bands (Minimum four bands) of Type XI retro-reflective sheeting shall be pasted @ 0.5m c/c starting from a height of 0.5 m above the finish road level.
Setting up of Flatted Factory Complex at Chabua, Dist. Dibrugarh
ON GRID SOLAR POWER: Design, Supply, Installation, Testing and commissioning of 20 kVA Solar On grid complete pacakage plant with required Meter. Solar Panel : Polycrystalline solar panel Panel structure: Included Solar Panel Watt: Min 330 Wp On grid PCU/: Included with min 2 years of warranty With protection of Short circuit current and earthfault AC Cable and DC cable : 50 meter Included All accessories included : Lugs , MC 4 c AC Cable And DC cable :50 meter Included All accessories included: Lugs,MC4 connectors etc
Road Safety Improvement Works for 2 corridors covering 14_10km in Chennai city SH1 Chennai Ennore Expressway Road SH48B Taramani Link Road
Proving and fixing Solar powered Traffic Blinkers of 30cm dia with Polycarbonate Dome 5mm Red of Led 150 Nos. iri each Red Blinkers Light - 1 No. with Red / White / Blue Led Blinkers Delineator Solar Panel : 12v 50w Solar Panel — 1 No. 12v 18 AH Battery -1 No. with Box, Solar Circuit Controller Board Box. Straight Pole : MS Pole 3” dia 2.5mm thick 18 Feet height pole (1 No.) with 2 Feet under ground pole foundation, pole painting including transportationcharges, installation charges etc., complete as per standard specification.
Road Safety Improvement Works for 1 corridor covering 10_60km in Chennai city (SH 10_9 Pallavaram Thoraipakkam Road)
Proving and fixing Solar powered Traffic Blinkers of 30cm dia with Polycarbonate Dome 5mm Red of Led 150 Nos. iri each Red Blinkers Light - 1 No. with Red / White / Blue Led Blinkers Delineator Solar Panel : 12v 50w Solar Panel — 1 No. 12v 18 AH Battery -1 No. with Box, Solar Circuit Controller Board Box. Straight Pole : MS Pole 3” dia 2.5mm thick 18 Feet height pole (1 No.) with 2 Feet under ground pole foundation, pole painting including transportationcharges, installation charges etc., complete as per standard specification.
Construction of Residential Portion in New District Jail Fatehabad (1 No. Superintendent Jail Residence, 6 Nos 1900 Sqft Houses, 24 Nos 800 Sqft Houses, 72 Houses 650 Sqft Houses, 12 Nos 550 Sqft Houses, Warder Hostel and 9 feet height Boundary wall)
[32.70.2]Supply Installation testing commissioning of Solar Photovoltaic grid connected roof top Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- (a) Solar Photovoltaic Module manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. (b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz plus /- 2.5 Hz, output voltage suitable to generate AC (c) Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degrees C. The PCU shall adjust the voltage and frequency level to suit grid frequency (d) Data Monitoring System complete with accessories. (e) Fixing of Array junction box and Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. (f) Lightning and surge voltage protection. (g) Connections and Interconnections by supplying and fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying and fixing of necessary channel/conduit lugs and other accessories etc. as required. 2. Above 10 kWp and up to 100 Kwp [Through Rate]