Loading…
Loading…
3,538 results • Best match
R & B Line Shifting HT/LT/ TC’s Work for Udhyognagar S/Dn under City Division, PGVCL, Porbandar
ERECTION OF STREET LIGHT FIXTURE COMPLETE WITH CLAMPS, BRASS NIPPLE, BRASS
E-Tender for Labour Work For Capital & Maintanance Of HT,LT Line and TC work Under Bagdana Sub Division
ERECTION OF STREET LIGHT FIXTURE COMPLETE WITH CLAMPS, BRASS NIPPLE, BRASS HOLDER TECK WOOD
E-Tender for Labour Work For Capital & Maintanance Of HT,LT Line and TC work Under Bagdana Sub Division
ERECTION OF STREET LIGHT FIXTURE COMPLETE WITH CLAMPS, BRASS NIPPLE, BRASS HOLDER TECK WOOD
Work for E/O HT,LT Line and Transformer center Erection/Replacement work, underground cabling work and line and maintenance work for All scheme under Bilkha Sub Division (2 Years)
ERECTION OF STREET LIGHT FIXTURE COMPLETE WITHCLAMPS, BRASS
Work for Series Lighting Decoration at GTPS during various festival on as and when require basis.
wiring/street light/panel maintenance work in P.H. area,
Sewerage and Septage Management for sewer system with STP and laying, jointing, testing and commissioning of Sewerage System in six (06) ULBs of Cluster-1 including 1 year defect liability with 10 years O and M.
... development such as internal roads of minimum 6 mtr wide, compound wall for STP site, internal street and building lightings, pathways of minimum 1 m wide to access all STP units and Entrance Gate in MS fabrication, ...