Loading…
Loading…
36,810 results • Best match
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) (3 (3 ))
Unbranded Lighting Pole Or Post And Hardware- Tubular Street | Brand:NA | Model:Light Pole | HSN:HSN not specified by seller | Qty:50 pieces | UnitPrice:19,500 | Amount:975,000
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) (3 (3 ))
Unbranded Lighting Pole Or Post And Hardware- Tubular Street | Brand:NA | Model:Light Pole | HSN:HSN not specified by seller | Qty:972 pieces | UnitPrice:3,304.97 | Amount:3,212,430.84
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) (3 (3 ))
Unbranded Lighting Pole Or Post And Hardware- Tubular Street | Brand:NA | Model:spw-0008 | HSN:HSN not specified by seller | Qty:80 pieces | UnitPrice:12,390 | Amount:991,200
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) (3 (3 ))
Unbranded--PREMIER ENGINEERING COMPANY Lighting Pole Or Post | Brand:Unbranded--PREMIER ENGINEERING COMPANY | Model:410SP-55 | HSN:HSN not specified by seller | Qty:1,582 pieces | UnitPrice:19,186 | Amount:30,352,252
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) (3 (3 ))
Unbranded Lighting Pole Or Post And Hardware- Tubular Street | Brand:NA | Model:DOUBLE ARM BRACKET | HSN:HSN not specified by seller | Qty:95 pieces | UnitPrice:62,681 | Amount:5,954,695
Installation of New LED Street Lights and Electrical Infrastructure at Tauru Ward No. 1 to 16 under Jurisdiction of Municipal Committee Tauru.
Supply, Erection, testing and commissioning of 3 phase automatic timer AMSON`s / L and T make on/off the street lights on different fixed timing maintainable on street lights pedestal, pillar, wall M.S pedestal where on\off point is available, cabinet is fabricated from 22 gauge, painting, wiring, connection on/off from bottom of the cabinet, 3 contractor 63 Amp, 24 volts D.C each transformer, rectifier system switching system, bakelite contractor 63 Amp, MCB 63 Amp LandT digital timer Auto/Manual system, time setter, fibber sheet, rubber and plastic component, wiring and component fitting, chemical (Epoxy) including the cost of labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In -Charge of the work.