CONSTRUCTION OF ADDITIONAL 5MVA FOR 33/11KV SUBSTATION SUITHAKALA, BUDHUPUR JAUNPUR AND CONSTRUCTION OF 11KV LINE FROM 33/11KV SUBSATATION SUITHAKALA, BUDHUPUR, DISTT. JAUNPUR ON SEMI TURNKEY BASIS.
Earthing of S/s outdoor equipments: Laying of earth mat in the switchyard by laying of M.S. round of 32 mm dia in 1000 mm deep trenches with M.S. round 32mm dia, 3 Mtr. long earth electrodes as per RESPO/approved SOP drawing. The work includes welding of the M.S. round, connecting all steel structures in the switchyard with the earth mat by means of G.I. strips of size 50x6 mm as per item below (All required materials will be provided by contractor)(A) Excavation of earth/trenches 1000 mm deep from FGL level for laying MS earth mat (32 mm dia MS round rod).(B) Laying of 32 mm dia MS round earth rod horizontally in 1000 mm deep trenches at every 3 mtr lengthwise and every 3 mtr widgthwise throughout the switchyard.(C) At the level of 1000 mm deep trenches, at each cross joint of horizontally laid MS earth mat, bury 3 mtr long 32 mm dia MS round earth rod vertically in the ground and properly shape and weld each joint. The works includes cutting, shaping and binding, preparation of joints, proper making and welding of main earth mat bar joints and applying bitumen, bitumen impregnated on joints U clamp i.e. end joints, cross joints, lap joints etc).(D) To weld riser GI strip of 50x6 mm from main horizontal earth mat as per leg of each switchyard structures and to weld riser strip from two different locations (top & bottom) on the leg of the structures of each equipments like Transformer, Terminal gantry, Bus-bar gantry, Post insulator, 33 kV CT, 33 kV PT, Line & Bus isolator etc.
CONSTRUCTION OF ADDITIONAL 5MVA FOR 33/11KV SUBSTATION NEWADIYA, LEDUKA (MACHHALIGAW), JAUNPUR AND CONSTRUCTION OF 11KV LINE FROM 33/11KV SUBSATATION LEDUKA, DISTT. JAUNPUR ON SEMI TURNKEY BASIS.
Earthing of S/s outdoor equipments: Laying of earth mat in the switchyard by laying of M.S. round of 32 mm dia in 1000 mm deep trenches with M.S. round 32mm dia, 3 Mtr. long earth electrodes as per RESPO/approved SOP drawing. The work includes welding of the M.S. round, connecting all steel structures in the switchyard with the earth mat by means of G.I. strips of size 50x6 mm as per item below (All required materials will be provided by contractor). (A) Excavation of earth/trenches 1000 mm deep from FGL level for laying MS earth mat (32 mm dia MS round rod).(B) Laying of 32 mm dia MS round earth rod horizontally in 1000 mm deep trenches at every 3 mtr lengthwise and every 3 mtr widgthwise throughout the switchyard.(C) At the level of 1000 mm deep trenches, at each cross joint of horizontally laid MS earth mat, bury 3 mtr long 32 mm dia MS round earth rod vertically in the ground and properly shape and weld each joint. The works includes cutting, shaping and binding, preparation of joints, proper making and welding of main earth mat bar joints and applying bitumen, bitumen impregnated on joints U clamp i.e. end joints, cross joints, lap joints etc).(D) To weld riser GI strip of 50x6 mm from main horizontal earth mat as per leg of each switchyard structures and to weld riser strip from two different locations (top & bottom) on the leg of the structures of each equipments like Transformer, Terminal gantry, Bus-bar gantry, Post insulator, 33 kV CT, 33 kV PT, Line & Bus isolator etc.
CONSTRUCTION OF ADDITIONAL 5MVA FOR 33/11KV SUBSTATION SURERI, RAMPUR, JAUNPUR AND CONSTRUCTION OF 11KV LINE FROM 33/11KV SUBSATATION SURERI, RAMPUR, DISTT. JAUNPUR ON SEMI TURNKEY BASIS.
Earthing of S/s outdoor equipments: Laying of earth mat in the switchyard by laying of M.S. round of 32 mm dia in 1000 mm deep trenches with M.S. round 32mm dia, 3 Mtr. long earth electrodes as per RESPO/approved SOP drawing. The work includes welding of the M.S. round, connecting all steel structures in the switchyard with the earth mat by means of G.I. strips of size 50x6 mm as per item below (All required materials will be provided by contractor)(A) Excavation of earth/trenches 1000 mm deep from FGL level for laying MS earth mat (32 mm dia MS round rod).(B) Laying of 32 mm dia MS round earth rod horizontally in 1000 mm deep trenches at every 3 mtr lengthwise and every 3 mtr widgthwise throughout the switchyard.(C) At the level of 1000 mm deep trenches, at each cross joint of horizontally laid MS earth mat, bury 3 mtr long 32 mm dia MS round earth rod vertically in the ground and properly shape and weld each joint. The works includes cutting, shaping and binding, preparation of joints, proper making and welding of main earth mat bar joints and applying bitumen, bitumen impregnated on joints U clamp i.e. end joints, cross joints, lap joints etc)., (D) To weld riser GI strip of 50x6 mm from main horizontal earth mat as per leg of each switchyard structures and to weld riser strip from two different locations (top & bottom) on the leg of the structures of each equipments like Transformer, Terminal gantry, Bus-bar gantry, Post insulator, 33 kV CT, 33 kV PT, Line & Bus isolator etc.
CONSTRUCTION OF ADDITION 5MVA FOR 33/11KV SUBSTATION NANDGANJ AND SAIDPUR RURAL GHAZIPUR. CONSTRUCTION OF 11KV LINE FROM 33/11KV SUBSATATION NANDGANJ, DISTT. GHAZIPUR ON SEMI TURNKEY BASIS
Earthing of S/s outdoor equipments:Laying of earth mat in the switchyard by laying of M.S. round of 32 mm dia in 1000 mm deep trenches with M.S. round 32mm dia, 3 Mtr. long earth electrodes as per RESPO/approved SOP drawing. The work includes welding of the M.S. round, connecting all steel structures in the switchyard with the earth mat by means of G.I. strips of size 50x6 mm as per item below (All required materials will be provided by contractor) (A) Excavation of earth/trenches 1000 mm deep from FGL level for laying MS earth mat (32 mm dia MS round rod),(B) Laying of 32 mm dia MS round earth rod horizontally in 1000 mm deep trenches at every 3 mtr lengthwise and every 3 mtr widgthwise throughout the switchyard, (C) At the level of 1000 mm deep trenches, at each cross joint of horizontally laid MS earth mat, bury 3 mtr long 32 mm dia MS round earth rod vertically in the ground and properly shape and weld each joint. The works includes cutting, shaping and binding, preparation of joints, proper making and welding of main earth mat bar joints and applying bitumen, bitumen impregnated on joints U clamp i.e. end joints, cross joints, lap joints etc),(D) To weld riser GI strip of 50x6 mm from main horizontal earth mat as per leg of each switchyard structures and to weld riser strip from two different locations (top & bottom) on the leg of the structures of each equipments like Transformer, Terminal gantry, Bus-bar gantry, Post insulator, 33 kV CT, 33 kV PT, Line & Bus isolator etc.
CONSTRUCTION OF ADDITION 5MVA FOR 33/11KV SUBSTATION BAJARANG NAGAR, MURTAZABAD, DOBHI JAUNPUR AND CONSTRUCTION OF 11KV LINE FROM 33/11KV SUBSATATION DOBHI, DISTT. JAUNPUR ON SEMI TURNKEY BASIS
Earthing of S/s outdoor equipments: Laying of earth mat in the switchyard by laying of M.S. round of 32 mm dia in 1000 mm deep trenches with M.S. round 32mm dia, 3 Mtr. long earth electrodes as per RESPO/approved SOP drawing. The work includes welding of the M.S. round, connecting all steel structures in the switchyard with the earth mat by means of G.I. strips of size 50x6 mm as per item below (All required materials will be provided by contractor)(A) Excavation of earth/trenches 1000 mm deep from FGL level for laying MS earth mat (32 mm dia MS round rod).(B) Laying of 32 mm dia MS round earth rod horizontally in 1000 mm deep trenches at every 3 mtr lengt.hwise and every 3 mtr widgthwise throughout the switchyard.(C) At the level of 1000 mm deep trenches, at each cross joint of horizontally laid MS earth mat, bury 3 mtr long 32 mm dia MS round earth rod vertically in the ground and properly shape and weld each joint. The works includes cutting, shaping and binding, preparation of joints, proper making and welding of main earth mat bar joints and applying bitumen, bitumen impregnated on joints U clamp i.e. end joints, cross joints, lap joints etc).(D) To weld riser GI strip of 50x6 mm from main horizontal earth mat as per leg of each switchyard structures and to weld riser strip from two different locations (top & bottom) on the leg of the structures of each equipments like Transformer, Terminal gantry, Bus-bar gantry, Post insulator, 33 kV CT, 33 kV PT, Line & Bus isolator etc.
Operation and maintenance of electrical substation installations at SJICR. Bengaluru.
Monthly operation and maintenance of DG set of capacity 3 x 1500 KVA, with Synchronization panel, Allied equipment, 11 KV HT Breaker panel with compact RMU, Electrical substation with 3 x 1600 KVA, transformer 11 KVA/433 volts MV panel and cables, Internal electrification and periodical services of Electrical installations at SJICR Bengaluru. (Rate to be quoted inclusive of ESI, PF, GST etc) (Monthly operational charges for first year to be quoted) (No of staff as mentioned in the bid document)