Loading…
Loading…
743 results • Best match
Construction of 2x5 MVA 3311 KV Substation Rajrai in Agra district on semi turnkey basis
SUB-STATION PART:- 33 KV Line Isolator.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - EHV Substation; Control and Relay Panel; As per GCC/SCC/TS
and Installation of Plant Systems/Equipments (Version 2) - EHV Substation; Control and Relay Panel; As per GCC/SCC/TS
Construction of 33KV Switching Substation at Shivpuri under Munikireti to provide 3 MVA power connection to RVNL .
53 LAYING OF CONTROL CABLE item51 415 M 0 160978 Excess(+) Full Conversion INR Laying of Control cable of all sizes through trench, proper connection at both ends outside in switchyard equipments (>&)> inside control room in VCB, control (>&)> relay Panels with proper marking, lugs , labelling (>&)> ferrules etc
QUANTUM OF WORK schedule of maintenance and attending breckdown 33/11 KV Substation in the area of Electricity Distribution Division-Purwa, Unnao.
Loading Carriage and unloading of PCC/ST pole from Electricity store center Unnao /Sub Station store/other site to site work as per required and vice versa. Distance 0-70 Km.
Construction of 2x5 MVA 3311 KV Substation Patholi Road in Agra district on semi turnkey basis
SUB-STATION PART:- 33 KV Line Isolator.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 132 KV SUBSTATION GULABBARI; Substation, Centrifuging of 63 MVA TF oil and Replacement work of 01 Nos damaged VI Provided by contractor 33 KV VCB Shreem Make and Complet..
and Installation of Plant Systems/Equipments (Version 2) - 132 KV SUBSTATION GULABBARI; Substation