Replacement of ACSR Conductor by Aerial Bunch Cable with supply and erection of associate material in different areas of Mohkampur under 33/11 KV Sub-Station, Balawala under EDSD, Balawala under EDD, Raipur.
Erection of Single support poles SP-21 in proper level and alignment along with fixing of all accessories. Like top channel & clamps as per RESPO construction Manual.
Replacement of ACSR Conductor by Aerial Bunch Cable with supply and erection of associate material in different areas of Nakronda under 33/11 KV Sub-Station, Balawala under EDSD, Balawala under EDD, Raipur.
Erection of Single support poles SP-21 in proper level and alignment along with fixing of all accessories. Like top channel & clamps as per RESPO construction Manual.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 220 KV SUBSTATION; Substation, Switchyard; Service Provider
Switchyard; Service Provider
Supply, installation, erection and commissioning of three nos 33KV on load isolator at 33KV/11KV/3.3KV main sub -station of AKKOCP under BnK Area.
Erection of 110 KV DC line on DC tower with Panther conductor by making LILO of the existing 110kV Tuticorin Auto - Sipcot feeder 1 at the proposed Maravanmadam 110 KV Sub-Station (Reach 1).
Erection of GI tower/tower extension parts ,square cross arm , DP structures with bolt & nuts including sorting out of tower parts as per the specification and punching of bolt & nuts, final checking and all other incidental charges for erection,including cost of all T&P,labour, lead, lift etc complete. as per approved drawing , BOM and specification. The rectification of defects found by operation staff during handing over of line to be done at free of cost...
Erection of 110 KV DC line on DC tower with Panther conductor by making LILO of the existing 110kV Tuticorin Auto - Sipcot feeder 1 at the proposed Maravanmadam 110 KV Sub-Station (Reach 2).
Erection of GI tower/tower extension parts ,square cross arm , DP structures with bolt & nuts including sorting out of tower parts as per the specification and punching of bolt & nuts, final checking and all other incidental charges for erection,including cost of all T&P,labour, lead, lift etc complete. as per approved drawing , BOM and specification. The rectification of defects found by operation staff during handing over of line to be done at free of cost...