Loading…
Loading…
2,226 results • Best match
Construction of Cement Concrete Road at 132 KV Substation Chambal Bhopal
eProcurement System Government of Madhya Pradesh Created By: ATUL NABAR Created Date/Time: 10-Jun-2026 11:21 AM Tender Title: Construction of Cement Concrete Road Tender ID: 2026_MPPTC_501945_1
Operation And Maintenance Of Substation - CARRIGE and REPLACEMENT OF DEFECTIVE 145 KV BREAKER OF 160 MVA 220 132 KV TRANSFORMER OVERHAULING OF 145 KV BREAKER OF LV SIDE OF 100MVA TF AT 220 KV FARIDNAGAR SUBSTATION UNDER ETD MURADNAGAR
Operation And Maintenance Of Substation - CARRIGE and REPLACEMENT OF DEFECTIVE 145 KV BREAKER OF 160 MVA 220 132 KV TRANSFORMER OVERHAULING OF 145 KV BREAKER OF LV SIDE OF 100MVA TF AT 220 KV FARIDNAGAR SUBSTATION UNDER ETD MURADNAGAR
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 220 KV IITGNL; Substation; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - 220 KV IITGNL; Substation; Service Provider
Repair and Maintenance of Feeder 5 (3.3 KV) from 6 MVA Substation under Sonepur Bazari Project.
Supply and erection of nuts, bolts ,flats and erection of clamps
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 132 KV SS; Substation; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - 132 KV SS; Substation; Service Provider
COMPREHENSIVE MAINTENANCE OF MES 110 KV SUBSTATION INCLUDING 110/11 KV POWER TRANSFORMERS, SUBSTATION YARD, 11 KV VCB PANELS, SCADA SYSTEM, AUX TRANSFORMER, APFC PANELS AT NAVAL BASE KOCHI
(xvii) Complete electric supply and lighting to the yard, substation and its surroundings. (xviii) Updating all safety measures and safety kits of the substation as well as the operators (xix) Making or replace all charts, safety tips, SOPs time to time as per the direction of the Engg in charge (xx) Ensure the lay out and connections of all type of control cables and UG cable in the 110KV yard and substation and kept it in a presentable manner in all time including providing complete single line diagramm and site plan showing complete 110KV and 11 KV line switch gears, transformer etc all as per the direction of the Engg in charge (xxi) Keep the fire extinguisher system and equipment of the 110KV yard and substation functional at any point of time. If any fire fighting equipment is found unsv/ non functional the contractor shall replace immediately,failing which a penalty of Rs.5000.00 per day shall be imposed. (xxii) Recording the reading of all earthing once in six month for each equipments, 110KV EHT switch gears, 11 KV HT switch gears, LT panel boards, 11/0.433 transformer etc the report /register of the earth value shall be submitted by the contractor to the Engg in Charge duly signed.