Loading…
Loading…
904 results • Best match
Supply of CCTV SYSTEM ANNUAL MAINTENANCE 2026-27
Fiber Optic Cable 6 Core (Branded)
Design, Engineering, Supply, Erection, Testing, Commissioning of 220/66kV GIS Substation at Bharthal, including complete civil works and automation, along with LILO of 220kV D/C Bamnauli-DIAL Overhead Transmission Line at Bharthal, on a Turnkey Basis
The contractor is responsible for supplying and laying of armoured Fibre Optics cables through HDPE Conduit by digging and laying through cable trench as per the site requirements including the supply of converters and other accessories (suitable for outdoor application) required to complete the connectivity in all respect as per the direction of Engineer-in-Charge.
Annual Operation and Maintenance of 33 Nos Radial Gates and Machinery at Kalisindh Dam Jhalawar for the Year 2026 27
Supply, Drawing and OLTS Testing, of OM2 Multi mode (50/125 µm) glass optic fiber cable, as per latest ammendments of TIA/EIA 568/ISO/IEC 11801:2011/ IEC 60794-1-2 E1, E3,E11, F1/ EN 50173-1/ EN 187 000/ IEC 60974-2, 2-20, 2-21/ ITU G.651 with outer sheath, cable should be used for LAN and WAN back bones, for indoor/outdoor installations these sheathed cable be placed in existing MS/PVC /HDPE Conduits/ slotted channels with ferruling at both ends for identification complete in all respect. 6 fiber
Replacement of 1x10MVA 110/11kV Power Transformers by 1x20MVA, 110/11kV Power Transformers and providing additional switchgear at 110/11kV Venkatagiri Sub Station in Gangavathi Taluk, Koppal District on Partial Turnkey Basis, including Supply of all Materials/Equipments (Excluding supply 20 MVA power transformers and 1lkV Switchgear) and Erection (including dismantling & Civil Works) of all Materials/Equipments, Testing and Commissioning.(CALL-5)
A1 Power Transformers: a) 20 MVA, 110/11kV, Delta/Star, Dyn11, 3-Ph, 50Hz, Core Type, 2 Winding Delta/Star transformer, vector group DYn11 with OLTC ONAN/ONAF with fan control cubicle, RTCC Panel, Numerical RTCC panel, first filling of Oil and 10% spare oil in non-returnable drums etc., complete with Terminal connectors suitable for Single Drake/Moose ACSR on primary side of transformer and 2 nos of 50 x 10 mm copper flat for each phase from LV side of Transformer to cable at 11 kV cable terminating structure with suitable support insulator on LV side of Transformer and 2 Nos of 75 mm X 6 mm copper flats from neutral terminal to earthmat through NCT along with necessary support pin insulators.(45 MT) No. 1 KPTCL SUPPLY
Supply, installation and removal of CCTV cameras on hiring basis at various occasions for the use of Kolkata Police for the period 2026-27.
Fiber Optic Cable, if required per meter including installation for entire event.
REQUEST FOR PROPOSAL (RFP) FOR Engagement of Agency for Supply, Installation, Testing, Commissioning and Maintenance of Smart Facial Recognition Entry Management System for the State Secretariat, Tripura
Fibre Optic Cable: Bidders to consider qty as per their design based on BOQ above