Loading…
Loading…
920 results • Best match
Annual work of spot monthly/bi-monthly billing at site for approx. 83,500 consumers under 5 nos. of sub-division of Morbi Division, under Circle Office, Morbi.
Telecommunications/Gas/ Water meter reading work) with HHE billing work/PDA-Blue
Annual work of spot monthly/bi-monthly billing at site for approx. 72500 consumers under 6 nos. of sub-division of Morbi Division-2, under Circle Office, Morbi.
Telecommunications/Gas/ Water meter reading work) with HHE billing work/PDA-Blue
Annual work of spot monthly/bi-monthly billing at site for approx. 40000 consumers under 4 nos. of sub-division of Wankaner Division, under Circle Office, Morbi.
Telecommunications/Gas/ Water meter reading work) with HHE billing work/PDA-Blue
Execution of Civil, Architectural finishing, MEP and other Miscellaneous works for Construction of Operation Control Centre (OCC) at Sarai Kale Khan Namo Bharat Station.
A standby spare charger (for 1 to 6 UPS cells) and a spare cell bank with 6 nos of cells. Control transfer from one UPS to another UPS shall not cause any disruption of power supply. Overall availability of UPS system shall be better than 99.99%. Provision of suitable Earth Leakage detection both AC and DC supplies and Alarms shall be made. Temperature monitoring equipment shall be incorporated in the UPS system to optimize the charger voltage as function of battery room temperature, to generate alarm in case of room temperature exceeding the preset permissible temperature and to predict the battery back time. Alarms, health status and displays generated by each UPS shall be shown locally i.e. at SCR of station, as well at remote location in both OCCs (at Modipuram or as nominated by employer) at one separate terminal each in respective OCC. Telecommunication Contractor will provide LAN port between stations and the OCC for communication purpose, the point of Interface between TER (Telecom Equipment Room) and CER (Central Equipment Room) at OCC. E&M Contractor shall make all other necessary arrangements such as communication cards/ ports.
Electrical General Services works in connection with Maintenance facility for expansion of Capacity of EMU Carshed at at Kurla Kalva Sanpada of Mumbai Division in Central Railway from 12 coach to 15 coach rake under MUTPIIIA
Verification of HT/ LT cable/ ariel route plans of all incoming & outgoing cables/ transmission line of 33Kv/ 22Kv/ 11Kv/ 2.2K v cable of Railways/ power supply authorities ( As available), preparation of final cable/transmission line route plans of both HT/LT cable showing relevant details for approval before start of the work and submission of as built drawings(Erection)
Construction of 8.0 km 33kV Single Circuit line with 3x300Sqmm UG Cable and 120sqmm, AAAC Covered Conductor from 110kV substation Trikkodithanam to proposed 33kV substation site at KINFRA, Kunnanthanam, under Hybrid Model Turn Key basis
Laying HT XLPE UG cable of sizes beyond 3x185 sq mm and upto and including 3x300 sqmm including conveying cable from Sub Regional Store/stacking place to work site and laying it carefully using cable rollers, taking through stone ware/G.I.pipes at road crossing/culverts/bridgesetc. whereever necessary, providing identification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top with bricks, providing cable route markers at 100m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling.