Loading…
Loading…
920 results • Best match
Design, Engineering, Supply, Installation, Testing & Commissioning of (1) NEW LASER PROJECTORS (FOR 2D TECHNOLOGY) FULLDOME DIGITAL PLANETARIUM SYSTEM, (2) NEW 5.1 SOUND SYSTEM & (3) NEW 12.5 METER NANO SEAM POWDER COATED PERFORATED ALUMINIUM CO-CENTRIC DOME of Sardar Vallabhbhai Patel Planetarium (SVPP) at Sayajibaug with 10 Years of Comprehensive Operation & Maintenance (3rd Time Invite)
Projector mounting structure, Perforated Dome, Cables, Power Conditioning
Provision of Submersible Sewage Pump Motor set over Howrah division.
Trenching and laying of cable underground by pucca floor / concrete cutting and commissioning of cable alongwith make good of floor surface as its original condition after laying of cable ( Cable will be supplied by Railway ) Above/
Electrical (General) work in connection with "Howrah - Modernization of Signal Workshop".
Trenching and laying of cable underground by pucca floor / concrete cutting and commissioning of cable through 80mm dia GI pipe including supply of GI pipe alongwith make good of floor surface as its original condition after laying of cable ( Cable will be supplied by Railway ) Above/
Revamping of Submersible pump motor set & Air conditioning system over Howrah Division.
Trenching and laying of cable underground by pucca floor / concrete cutting and commissioning of cable alongwith make good of floor surface as its original condition after laying of cable ( Cable will be supplied by Railway ) Above/
Conversion of LT O.H. line by U.G. cable for reducing theft of electricity in railway staff colonies over Howrah division (Phase-II).
Trenching and laying of cable underground by pucca floor / concrete cutting and commissioning of cable alongwith make good of floor surface as its original condition after laying of cable ( Cable will be supplied by Railway ) Above/
Electrical (general) work in connection with "Improvement of Bolpur & Gushkara Railway Colony".
Trenching and laying of cable underground by pucca floor / concrete cutting and commissioning of cable alongwith make good of floor surface as its original condition after laying of cable ( Cable will be supplied by Railway ) Above/