Loading…
Loading…
898 results • Best match
SPECIAL REPAIR OF HT CABLES, POLES STRUCTURES AND CONVERSION OF OVERHEAD HT LINES TO UNDERGROUND CABLES ALONGWITH ALLIED WORKS AT SILA GARRISON UNDER GE NAGROTA
Sand cushioning to under ground cable laid in trenches for laying of HT/ LT UG cables 8 cm wide before laying the cable and 15 cm after laying and punned down to a depth of 10 cm as per MES SSR Part-I (2009), complete all as specified and directed. Note: Punned thickness shall be measured and paid to the contractor.
Grommet and Sleeve Application Work at Sharp Edges and Strengthening of Cable Trays with Car Body Structure in RS-3 and RS-9 Trains.
Contract: ORM-2222: “Grommet & Sleeve Application Work at Sharp Edges and Strengthening of Cable Trays with Car Body Structure in RS-3 & RS-9 Trains”.
Design & Construction of Broad-Gauge Single Line Railway Siding between Balaramapuram Railway Station on Southern Railway to Vizhinjam International Seaport including Civil Engineering Works comprising of a 9 km long tunnel, 0.43 km long Adit, their ... Supply Installation Works, ... & Telecommunication , ...
including BLT in tunnel, Over Head Electrical Traction Works, associated Power Supply Installation Works, General Electrical Works, Signalling & Telecommunication, Integrated Tunnel Communication, PA system and Video surveillance System Works etc., complete, in the State of Kerala, Project Chainage : km (-)1.200 to km (-) 10.708 i.e., Length: 9508 m on Engineering, Procurement & Construction (EPC) basis" CORPORATE OFFICE-ENGINEERING/KRCL
Ruggedized rack with 10 Slots Ethernet Backplane Dual power supply, Redundant HSBY processor module M580_Level 6_ Conformal Coated for RIO with battery, 4GB Memory card for M580 CPU, M580 Hot standby Single Mode Fiber optics SFP socket adapter with ... HSBY cable , ... Ethernet Fiber Converter ...
M580 Hot standby Single Mode Fiber optics SFP socket adapter with HSBY cable Model No 490NAC0201
Annual Maintenance Contract of sectional OFC in section JRBM-KGBP (54.26 KM), BHRB-SANG (50.5 KM) , LMG-FKG ex NLN-DPU (129.2 KM) and other block section (86.89 KM) of Lumding Division
Deployment of maintenance team for maintenance of Optical Fiber cable network as per TS (Section JRBM-KGBP) [54.26 KM]
Providing & fixing of 11KV Outdoor bus arrangement with support structure arrangement for XLPE power cable of Transformers at Various 66kv SS under Navsari Circle