Loading…
Loading…
529 results • Best match
MAIN TRANSFORMER 7775 KVA
Description :MAIN TRANSFORMER 7775 KVA FOR WAP-7 & WAP-5 LOCO. as per Specn. CLW/ES/3/0660 R ev. D or latest & STR No. CLW/C-D&D/STR/001 Rev.1 or latest . Tank Spec.No. CLW/ES/3/0507 Alt . Nil or L atest Conservator Tank Spec. No.: CLW/ES/3/0508 Alt- Nil or Latest & STR No. RDSO/2013/EL/STR/0079 Re v.0 or latest. [ Warranty Period: 30 Months after the date of delivery ] ] Consignee General Stores Depot, BLW Uttar Pradesh 147.00 Numbers UVAM Item ref. ( Item Id :- 2100051 - Main Transformer 7775 KVA Type Lot 7500 for WAP-7 & WAP-5 Locos ) Inspection Details Stage Inspection Not Required
Transformer Oil cooling blower
Description :Transformer oil cooling blower casing [Duct/Dom] complete with net guard and impeller but without motor for locos as per CLW Spcn. CLW/ES/B-14/ Alt - C. [ Warranty Period: 30 Months aft er the date of delivery ] [Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitt ed: Max 8 lacs ] ] Consignee Dy CMM/D/KANCHRAPARA, ER West Bengal 59.00 Numbers UVAM Item ref. ( Item Id :- 2100724 - Blower VRH ) Inspection Stage Inspection Not Required Details
Transformer Differential Protection Relay
Transformer Differential Protection Relay
Replacement of Brazer Transformer
Replacement of Brazer Transformer
200 VA control Transformer
Description :Supply of 200 VA control Transformer, 750/415 V AC, 50HZ, 1 phase, dry type and Air cooled control Transformer for the SBC of power car, Type II, as per RDSO specification No. RDSO/PE/SPEC/AC/020 3-2020 (REV-0) OR latest. Transformer should be DULY FITTED WITH APPROVED MAKES 4 AMPS/1.2 KV FUS E LINK WITH FUSE BASE FOR PRIMARY AND 2 AMPS/500 VOLT FUSE LINK WITH BASE FOR SECONDARY WITH APPROVED MAKE Make: BHASIN PACKARD, NACEI, AEL, RAMYAA, ABROL, TROLEX, OM INDUSTRIES. Note: M aterial shall procure said OEM or his authorized dealers only. Firms should attach RDSO approval letter for t he item along with offer. Offer received without RDSO approval letter shall be summarily rejected. [ Warra nty Period: 30 Months after the date of delivery ] ] Consignee SSE/Elec/AC/UBL, SWR Karnataka 363.00 Numbers Inspection Details Stage Inspection Not Required
AIR DRYER FOR TRANSFORMER
AIR DRYER FOR TRANSFORMER