Loading…
Loading…
2,545 results • Best match
Supply, Erection Testing & Commissioning of Transformer oil Filtration Plant of Capacity 1000 LPH as per attached annexure.
Description :Supply, Erection Testing & Commissioning of Transformer oil Filtration Plant of Capacity 1000 LPH as per attached annexure. [ Warranty Period: 30 Months after the date of delivery ] ] Sr.Section Engineer(TLAC)AJNI, Maharashtra 1.00 Numbers Consignee CR
Set of electric locomotive main transformer bushing hardwares as per Spec No. CLW / ES / 3 / 0456/K
Description :Set of electric locomotive main transformer bushing hardwares as per Spec No. CLW / ES / 3 / 0456/K [ Warranty Period: 30 Months after the date of delivery ] ] Consignee SSE/DSL/GD, NER Uttar Pradesh 11.00 Set
Supply, Installation, Testing and Commissioning of Testing Equipment, Measuring Equipment and Machinery, Transformer Oil Storage Tank etc.
Servicing / dehydration of 2000 KVA 11000/415 Volt Kirloskar make transformer no.2 at G.K. (South) BPS
Disconnecting of HT supply from main HT panel after proper switching off 11 KV MOCB discharging the supply. Complete drain out of transformer oil from transformer to empty oil drum by oil machine, dismantling of conservator tank all protection relays cable end boxes vent pipes and other items as required.
Supply ,Installation ,testing & commissioning of 11 KV/415V, 100 KVA, 3 phase oil immersed outdoor type Transformer
Description :Supply ,Installation ,testing & commissioning of 11 KV/415V, 100 KVA, 3 phase oil immersed outdoor type Transformer including accessories as per detailed technical specification attached on existing structure arrangement as per technical arrangement attached /site conditions. The transformer is to be loa ded, Transported and unloaded fixing arrangement complete with nut, bolts and clamps etc.as per detailed technical specification attached Warranty on complete Transformer- 24 months Note: Authorized certificate and Challan/Invoice/Test report/Warranty certificate to be submitted with delivery of material [ Warranty Period: 24 Months after the date of delivery ] ] Consignee SSE POWER Kota, WCR Rajasthan 1.00 Numbers Inspection Details Stage Inspection Not Required
Supply, installation and commissioning of Transformer Oil Purification Plant capacity 5000 LPH as per Railway specification attached.