Loading…
Loading…
939 results • Best match
as per Nit
LAYING OF RABBIT CONDUCTOR IN HT LINE
39/SE(T)/LCZ/2026-27
Fabrication & erection of single pole for LT line on 8.5 M long pcc pole with fixing of necessary clamps & other acessories like clamp hook, dead/suspension clamp,neutral clamp,ABC pressure clamp (if required) and danger board with clamp.(all material arranged by contractor except steel & pole if required).
16/SE(T)/LCZ/2026-27
Stringing,Sagging,winding and jumpering of LT line with AB Cable (3x120+1x95+1x16) conductor as per RESSPO Norms. (AB Cable provided by deptt and balance material like holding clamp, eye hook, suspension clamp and dead end clamp arranged by contractor .)
Modification of existing 33 KV OH Power Line Track Crossings (4-nos) by replacing with HT Cable running over OHE structures at different locations in between GDRA- NPML stations of PDPL-LPJL sections (Group 206) of South Central Railway under Railway Electrification Project/Secunderabad.
Preparation and submission of completion Set drawings in A3 size with all relevant details and measurements of executed power line crossings and transmission power line crossings. Material cost
Quantam of work shedule of shifting of Sandila Chakalwanshi Bithoor Chaubepur Marg State Street No. 166 Km 31 to 38.00 mm KV lines for line shifting under Full Deposit Scheme in the area of Sub Division Miyaganj under the EDD-V Hasanganj Unnao.
Erection of PCC/STP Single pole (HT/LT Line) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site.
25/EDC(H)/2026-27
Stringing & Sagging ABC Cable (3x50+1x70+1x16) sq mm. winding & jumpering of LT Line With AB Conductor as per RESSPO norms AB Conductor Provided by Dpt and balance materials lin ke holding clamp eye hook suspension clamp &dead end clamp arranged by the conductor