Loading…
Loading…
939 results • Best match
REROUTING AND STANDARDISATION OF 11KV LINE FROM PANNIYADI TO DODDUVAYAL UNDER ELECTRICAL SECTION, KUTTIKKOLE
Additional rate for reinstalling LT line on the renewed 11kV pole having both HT and LT (HT/LT) lines.
For the work of A.B Cable Reconductoring and Additional Circuit, Replacement of Damage Line and Pole, PVC Wrapping on Pole, Stay Set and Stay insulator and Battery Charger sanctioned under Business Plan 2026-27 in areas under Electricity Urban Distri
Laying & sagging of LT ABC (3X120+1X95+1X16) Sq.mm. Cable of LT Line with fixing of Distribution Box with Clamp, Insulated Dead end clamp with I hook, Suspension clamp with I hook(Insulated), LT insulated Piercing connector, XLPE 1X35 Sq.mm. Al. cable for enerzing DB, XLPE 1X16 Sq.mm. Al. cable for giving connection to Street Light and including disconnection & reconnection of consumer cables, nuts&bolts off size by the contractor.
Reconductoring with LT ABC and Covered Conductor at S H Convent DTR under ES Parathode
Reconductoring LT line with ABC and Covered conductor
QUANTUM OF WORKS INVOLVED FOR (INCREASING CAPACITY OF 25 KVA TO 100 KVA DISTRIBUTION TRANSFORMER AND OTHER RELATED WORKS IN THE AREA OF E.D.S.D.-III, MIYAGANJ UNDER THE E.D.D. V, HASANGANJ, UNNAO. UNDER BUSINESS PLAN YEAR 2026-27.
Laying stringing and sagging of 11 HT Lines by ACSR weaseal conductor including all associated work with joint/jumpers and binding of insulator as required.
Re-routing cross country HT OH line from Cheriyavelinalloor (CW-4591-202526-109) of Electrical Section Ayoor under Electrical Division Kottarakkara
Fitting one LT 2 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line.
STRENGTHENING OF 33 KV LINE WORK IN BP 2026-27 UNDER EUDD 33 KV YEIDA
Providing of following material of standard make / best quality for complete the work of HT line as per RESSPO norms by the contractor at his own cost : -