Loading…
Loading…
939 results • Best match
40/SE(T)/LCZ/2026-27
Fabrication & erection of single pole for LT line on 8.5/09 M long ST/PCC pole with fixing of necessary clamps & other acessories like clamp hook, dead/suspension clamp,neutral clamp,ABC pressure clamp (if required) and danger board with clamp.(all material arranged by contractor except steel & pole if required).
REPLACEMENT OF DAMAGED, LT ABC/LT NAKED WIRE LINE, EARTHING OF T/f, MISC. WORK IN SWITCH YARD, 250 KVA IInd Point, CAP. INC. OF DISTRIBUTION Tf 250 TO 400 KVA, CONSTRUCTION AND STRENGHTNING OF 11 KV U/g LINE, AT DIFFERENT SITE UNDER EUDD-MAYOHALL
Replacement of Damaged LT Line (ABC/Naked Conductor line by New ABC 3x120 sq mm ABC including fixing of as per site requirement as necessary Channels, clamps, angle, channel and LT nsulator,dead End Clamp, i hook, Suspention Clamp,Piercing Connector, Nut & Bolts etc (All materials will be arranged by the conctractor except 11 m ST Pole) including dismantling work of existing LT Line and it relatated work as safe Dismentaling of Existing Utility and after Erection of Line all dismantled Line, Consumer Service Connection (single/Three Phase) as Steet lite and other existing thing Fixed on new Pole and LT Lines .
43/EDC(G)/2026-27
Cutting of tree branches for cleaning route of 11 KV/LT line at the work site (25 mtr.= 1 Job)
Kawad Yatra Work Mohan Nagar
Providing and fixing bamboo separator in LT line complete in all respect as per RESPO norms.
Laying of 11 KV U/G cable from Thana Patel Nagar to Pardhan Enclave and Chnadra Vihar Under EDSD Turner Road.
LAYING OF DOG CONDUCTOR IN HT LINE
Survey, Investigation and Preparation of DPR). (DEPOSIT WORK).
Survey and investigation work for providing a sewerage scheme to the National Institute of Fashion Technology (NIFT), Kangra, District Kangra, Himachal Pradesh, shall be carried out using advanced survey technologies, including Differential Global Positioning System (DGPS) and Total Station, with a precision limit of 0.5 cm. The scope of work includes preparation of a nodal plan for the sewerage network, preparation of a site contour plan for the Sewage Treatment Plant (STP), measurement and documentation of unit dimensions of existing infrastructure, geotagging of households, marking of proposed sewerage alignments, and preparation of longitudinal sections (L-sections) and cross-sections (X-sections) as required based on site conditions. A reconnaissance survey shall be conducted for the preparation of a digital contour plan with a contour interval of 1.00 meter, clearly showing features such as houses, HT lines, roads, and other major benchmarks as required. Contour plans for the sewerage system at various locations shall be prepared in accordance with the latest norms, along with detailed engineering drawings. All drawings shall be prepared using AutoCAD, and a total of four (04) sets of drawings shall be submitted in both hard copy (properly bound) and soft copy formats, complete in all respects, as per the directions of the Engineer-in-Charge.