Loading…
Loading…
915 results • Best match
Combined Package of the following works Work-A Establishing 2x160MVA, 220/110/11kV & 1x10MVA, 110/11kV sub-station at Byadagi (Lakamajikoppa) Work-B Upgradation of 2x5MVA, 33/11kV sub-station to 2x20MVA, 110/11kV sub-station at Bommanahalli. Work-C Upgradation of 2x5MVA, 33/11kV sub-station to 2x20MVA, 110/11kV sub-station at Belagalapeth Work-D Establishing 2x20MVA, 110/11kV sub-station at Hanumanamatti
Combined Package of the following works; WORK A: Establishing 2x160MVA, 220/110/11kV & 1x10MVA, 110/11kV Sub-station at Byadagi (Lakamajikoppa) and Construction of 220kV Transmission line from the existing 220kV Guttur-Haveri DC line to the proposed 220/110/11kV Byadagi Sub-station for a distance of 0.752kms and 110kV Transmission Line for a distance of 56.58kms along with Construction of 4Nos. of 110kV Terminal Bays in Byadagi Taluk, Haveri District on “Partial Turnkey Basis” including Supply of all matching Materials/Equipments (Excluding Supply of 1x10MVA Power Transformer &11kV Switchgear) and Erection (Including Dismantling and Civil Works) of all Materials/ Equipments, Testing and Commissioning. WORK B: Upgradation of 2x5MVA, 33/11kV Sub-station to 2x20MVA, 110/11kV Sub-Station at Bommanahalli and Construction of 110kV DC line using Panther conductor from 110kV Akkialur (Balambeeda) Sub-station to the proposed 110kV Bommanahalli Sub-station for a distance of 16.626km and Construction of 2Nos. of 110/11kV Terminal Bays at ongoing 110kV Akkialur (Balambeeda) Sub-station in Hanagal Taluk, Haveri District on “Partial Turnkey Basis” including Supply of all matching Materials/Equipments (Excluding Supply of 11kV Switchgear) and Erection (Including Civil Works) of all Materials/ Equipment, Testing and Commissioning. WORK C: Upgradation of 2x5MVA, 33/11kV Sub-station to 2x20MVA, 110/11kV Sub-station at Belagalapeth and Construction of 110kV DC line using Panther conductor from 110kV Akkialur (Balambeeda) Sub-station to the proposed 110kV Belagalapeth Sub-station for a distance of 8.664km along with Construction of 2nos. of 110kV Terminal Bays at ongoing 110kV Akkialur (Balambeeda) Sub-station in order to terminate proposed 110kV DC line from the proposed 110/11kV Belagalapeth substation in Hanagal Taluk, Haveri District on ‘Partial Turnkey Basis’ including Supply of all matching Materials/Equipments (Excluding supply of 11kV Switchgear) and Erection (including Civil Works) of all Materials/Equipments, Testing and Commissioning. WORK D: Establishing 2x20MVA, 110/11kV Sub-station at Hanumanamatti and Construction of 110kV LILO line from 110kV Ranebennur-Byadagi SC line to the proposed 110/11kV sub-station at Hanumanamatti for a distance of 2.414kms in Ranebennur Taluk Haveri District on “Partial Turnkey Basis” including Supply of all Materials/Equipments (Excluding supply of 11kV Switchgear) and Erection (Including Dismantling and Civil Works) of all Materials/Equipments, Testing and Commissioning.
Establishing 2x20 MVA, 66/11kV substation at Kumbenahally and construction of 66kV LILO line on 110kV DC towers using Coyote conductor for a distance of about 0.07km from one circuit of 66kV Yachenahally-Singapura-Kadavinkote DC line to proposed Kumbenahally substation in Channarayapatna Taluk, Hassan District
LE2 Conducting drone survey of transmission Lines for collection of data along with Aerial inspection of EHV Line corridor using LIDAR method for measurements of vertical, horizontal and ground clearances of the LT/HT/EHV/PandT lines, major road/railway/river crossing, buildings, vegetation’s, etc., which is found to cross or running in parallel with the KPTCL existing EHV lines and sag measurements and other works. The rates include to collect details such as, i Vegetation growth close to conductor along the width of corridor with measurements ii Building/construction violation along the corridor with measurements iii Clearance measurement of Roads/Railways. River crossings iv Clearance measurement of EHV/Power line crossings (up and down) v Clearance measurements of tower elements (Hang point & Ground point measurement) vi Sag measurement of each span of the line all phases vii Location of tower (GPS coordinates), type of tower, height of tower, span length and conductor type viii Angle of deviation of tower ix Submission of detailed consolidated final report for surveying work done appending all the above details including all relevant information collected during survey certificates of the instruments used for the work, photos/videos taken at site and submitting soft copies and hard copy of all documents & reports in 3 sets. Note: 1) The minimum requirement of LiDAR camera is as follows point cloud with RGB mapping Accuracy of +/-25cm ability to gather minimum of 75 points/sqmtr. 2) Minimum 1 km length shall be considered for payment. 3) Patrolling shall at least cover the minimum corridor area as per the voltage classes. per route Km 0.351
Running works contract for the Erection works for HT Overhead feeder, LT Overhead feeder, Structure Erection works and Dismantling works in AEE O and M Pollachi Subdivision in Pollachi Division.
Providing of line spacers in LT lines 1 phase
Running works contract for the Erection works for HT Overhead feeder, LT Overhead feeder, Structure Erection works and Dismantling works in V.Velur section of AEE O and M Pethappampatty Subdivision in Pollachi Division.
Providing of line spacers in LT lines 1 phase
Running works contract for the Erection works for HT Overhead feeder, LT Overhead feeder, Structure Erection works and Dismantling works in AEE West Pollachi Subdivision in Pollachi Division.
Providing of line spacers in LT lines 1 phase
Running works contract for the Erection works for HT Overhead feeder, LT Overhead feeder, Structure Erection works and Dismantling works in AEE Pethappampatty Subdivision in Pollachi Division.
Providing of line spacers in LT lines 1 phase