3 LPE COATED CARBON STEEL PIPELINE LAYING AND ASSOCIATED WORKS IN Jehanabad GA (GROUP A)
Test Lead Point TYPE H (HT LINE CROSSING) with minimum two cables including 1Cx06 Sq.mm armoured Potential measurement cables & 1Cx2 5 Sq.mm armoured galvanic anode connection, pin brazing connection encapsulation kit etc. : Supply, installation, testing & commissi oning of Test Lead Point (TLP) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front d oor, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concr ete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad w elding/ pin brazing technique), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE , Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The w ork includes supply and fixing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direc tion of flow, connection scheme, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corros ion coupon wherever installed, all as per the direction and specification detailed in the document complete with tools, tackles & ot her necessary requirement. The work complete in all respects including all materials, tools, tackles, labour as per tender specifica tions, AFC drawings & directions of the Site Engineer/Engineer-In-Charge.
3 LPE COATED CARBON STEEL PIPELINE LAYING AND ASSOCIATED WORKS IN Madurai GA (GROUP C)
Test Lead Point TYPE H (HT LINE CROSSING) with minimum two cables including 1Cx06 Sq.mm armoured Potential measurement cables & 1Cx2 5 Sq.mm armoured galvanic anode connection, pin brazing connection encapsulation kit etc. : Supply, installation, testing & commissi oning of Test Lead Point (TLP) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front d oor, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concr ete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad w elding/ pin brazing technique), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE , Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The w ork includes supply and fixing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direc tion of flow, connection scheme, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corros ion coupon wherever installed, all as per the direction and specification detailed in the document complete with tools, tackles & ot her necessary requirement. The work complete in all respects including all materials, tools, tackles, labour as per tender specifica tions, AFC drawings & directions of the Site Engineer/Engineer-In-Charge.
Establishing 2x20 MVA, 110/11kV sub-station at Rajeev Grama and Construction of 110kV DC Line from existing 110/33/11kV Shiggaon sub-station to proposed 110/11kV Rajeev Grama sub-station using Panther conductor for a distance of about 9.874kms near Konanakeri Village along with Construction of 110kV Terminal Bays at existing 110/33/11kV Shiggaon sub-station in Shiggaon Taluk & Haveri District.
LE2 ii.Conducting drone survey of Transmission Lines for collection of data along with Aerialinspection of EHV Line Corridor using LIADR method for measurement of Vertical, horizontal and ground clearances of the LT/HT/EHV/ P&T lines, major road/railway/river crossing, building, vegetations etc., which is found to cross or running in parallel with the KPTCL existing EHV lines and sag measurements and other works. Km 9.8740
LT Reconductoring, Conversion under Vattakayam transformer area under Electrical Section Erattupetta
Reconductoring LT line with ABC
Combined Package of the following works Work-A Establishing 2x160MVA, 220/110/11kV & 1x10MVA, 110/11kV sub-station at Byadagi (Lakamajikoppa) Work-B Upgradation of 2x5MVA, 33/11kV sub-station to 2x20MVA, 110/11kV sub-station at Bommanahalli. Work-C Upgradation of 2x5MVA, 33/11kV sub-station to 2x20MVA, 110/11kV sub-station at Belagalapeth Work-D Establishing 2x20MVA, 110/11kV sub-station at Hanumanamatti
Combined Package of the following works; WORK A: Establishing 2x160MVA, 220/110/11kV & 1x10MVA, 110/11kV Sub-station at Byadagi (Lakamajikoppa) and Construction of 220kV Transmission line from the existing 220kV Guttur-Haveri DC line to the proposed 220/110/11kV Byadagi Sub-station for a distance of 0.752kms and 110kV Transmission Line for a distance of 56.58kms along with Construction of 4Nos. of 110kV Terminal Bays in Byadagi Taluk, Haveri District on “Partial Turnkey Basis” including Supply of all matching Materials/Equipments (Excluding Supply of 1x10MVA Power Transformer &11kV Switchgear) and Erection (Including Dismantling and Civil Works) of all Materials/ Equipments, Testing and Commissioning. WORK B: Upgradation of 2x5MVA, 33/11kV Sub-station to 2x20MVA, 110/11kV Sub-Station at Bommanahalli and Construction of 110kV DC line using Panther conductor from 110kV Akkialur (Balambeeda) Sub-station to the proposed 110kV Bommanahalli Sub-station for a distance of 16.626km and Construction of 2Nos. of 110/11kV Terminal Bays at ongoing 110kV Akkialur (Balambeeda) Sub-station in Hanagal Taluk, Haveri District on “Partial Turnkey Basis” including Supply of all matching Materials/Equipments (Excluding Supply of 11kV Switchgear) and Erection (Including Civil Works) of all Materials/ Equipment, Testing and Commissioning. WORK C: Upgradation of 2x5MVA, 33/11kV Sub-station to 2x20MVA, 110/11kV Sub-station at Belagalapeth and Construction of 110kV DC line using Panther conductor from 110kV Akkialur (Balambeeda) Sub-station to the proposed 110kV Belagalapeth Sub-station for a distance of 8.664km along with Construction of 2nos. of 110kV Terminal Bays at ongoing 110kV Akkialur (Balambeeda) Sub-station in order to terminate proposed 110kV DC line from the proposed 110/11kV Belagalapeth substation in Hanagal Taluk, Haveri District on ‘Partial Turnkey Basis’ including Supply of all matching Materials/Equipments (Excluding supply of 11kV Switchgear) and Erection (including Civil Works) of all Materials/Equipments, Testing and Commissioning. WORK D: Establishing 2x20MVA, 110/11kV Sub-station at Hanumanamatti and Construction of 110kV LILO line from 110kV Ranebennur-Byadagi SC line to the proposed 110/11kV sub-station at Hanumanamatti for a distance of 2.414kms in Ranebennur Taluk Haveri District on “Partial Turnkey Basis” including Supply of all Materials/Equipments (Excluding supply of 11kV Switchgear) and Erection (Including Dismantling and Civil Works) of all Materials/Equipments, Testing and Commissioning.
Running works contract for the Erection works for HT Overhead feeder, LT Overhead feeder, Structure Erection works and Dismantling works in AEE O and M Pollachi Subdivision in Pollachi Division.
Providing of line spacers in LT lines 1 phase