Loading…
Loading…
906 results • Best match
work of installing new distribution transformers at 21 locations under the Business Plan for the year 2026 27 within the jurisdiction of the Executive Engineer Electricity Distribution Division Khalilabad
Erection of single support ST/PCC pole for construction of 11 KV/LT line including digging of pit, fitting of all accessories, back filling of earth & others required work.
Capacity enhancement work of transformers under Business Plan 2026-27 in the working area of EDD HARRAIYA Basti
Loading carrige & Unloding of Remaining HT/LT Line & other material (ACSR Weasal+ABC Cable) from store to Different work site Village under Harraiya Basti.
Strengthening of existing 220kV DC line from 220 66 11kV Bidadi R s to 220 66 11kV Somanahalli R s by replacing DRAKE conductor to AAAC MOOSE conductor.
LE2 Drone survey Conducting drone survey of Transmission lines for collection of data along with Aerial inspection of EHV line corridor using LIDAR method for measurements of vertical, horizontal and ground clearnace of the LT/HT/EHV/P&T lines, major roads/railway/river crossing/buildings, vegetations, etc., which is found to cross or running in parallel with the KPTCL exisiting EHV lines and sag measurements and other works (Before commencement & after execution of work) MT 7.904
Construction of 33 KV Underground line from 132 KV Minto Park Sub Station to 33 KV Meyo Hall and 132 KV Minto Park Sub Station to 33 KV Civil LIne Sub Station in the Head of BP 2026-27
LT/HT Line
same as above
HT Line (Supply Part)
Establishing 2x20MVA, 110/11 kV substation at Nittur and construction of 110kV LILO line using Lynx conductor from on going 110kV Tiluvalli-Hunsabhavi SC line to proposed 110/11kV Nittur substation for a distance of 5.013km in Hirekerur Taluk, Haveri District
LE2 ii.Conducting drone survey of Transmission Lines for collection of data along with Aerialinspection of EHV Line Corridor using LIADR method for measurement of Vertical, horizontal and ground clearances of the LT/HT/EHV/ P&T lines, major road/railway/river crossing, building, vegetations etc., which is found to cross or running in parallel with the KPTCL existing EHV lines and sag measurements and other works. Km 5.0130