Loading…
Loading…
939 results • Best match
Mechanical strengthening of 220KV S/C Chhatral - Gandhinagar line under Mehsana TR circle
[a] HT/LT line or tap line crossing under each span of line of the work.
Interlinking 11 KV line from padoor high school AB to Idiyanchira AB Strengthning work under Electrical Section Venkidangu
Fitting one LT 2 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line.
3 LPE COATED CARBON STEEL PIPELINE LAYING AND ASSOCIATED WORKS IN Salem GA (GROUP B)
Test Lead Point TYPE H (HT LINE CROSSING) with minimum two cables including 1Cx06 Sq.mm armoured Potential measurement cables & 1Cx2 5 Sq.mm armoured galvanic anode connection, pin brazing connection encapsulation kit etc. : Supply, installation, testing & commissi oning of Test Lead Point (TLP) fabricated MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front d oor, Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing. The work includes providing requisite concr ete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad w elding/ pin brazing technique), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE , Cu cables (as indicated in standard drawings/specifications) of required length (as per site conditions) and size, lugs etc. The w ork includes supply and fixing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direc tion of flow, connection scheme, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corros ion coupon wherever installed, all as per the direction and specification detailed in the document complete with tools, tackles & ot her necessary requirement. The work complete in all respects including all materials, tools, tackles, labour as per tender specifica tions, AFC drawings & directions of the Site Engineer/Engineer-In-Charge.
Work of installing additional transformers under Business Plan 2026-27 in the working area of EDD HARRAIYA Basti.
Loading carrige & Unloding of Remaining HT/LT Line & other material (ACSR Weasal+ABC Cable) from store to Different work site Village under Harraiya Basti.
59/EDC(G)/2026-27
Cutting of tree branches for cleaning route of 11 KV/LT line at the work site (25 mtr.= 1 Job)
Work of Dismantling of existing FOAC cable and Laying, installation, splicing and commissioning of Fibre optic approach cable (DWSM – Dual Window Single Mode, 24F & 48F) with supply of HDPE pipe, hardware like ties/clips/cleats, conduits, supports, fittings, accessories due to shifting of equipments from old Control toom to New Control room at 220KV Jambuva S/S under Jambuva AM Division under Jambuva Circle
above transmission lines and laying of APPROACH on rest of transmission lines is continuously in progress.