Loading…
Loading…
4,398 results • Best match
16/EDC(H)/2026-27
Stringing & Sagging ABC Cable (3x50+1x70+1x16) sq mm. winding & jumpering of LT Line With AB Conductor as per RESSPO norms AB Conductor Provided by Dpt and balance materials lin ke holding clamp eye hook suspension clamp &dead end clamp arranged by the conductor
As per NIT
Installation of ERS Tower at 132 KV DC Sikandra-Railway TSS CKT-I/II under ETD-II Agra
Destringin of all 2 phase conductors & Earthwire of ERS Line section and safe removal of ERS Towers after restoration of main transmision through newly constructed Transmission Line and properly rolling of conductor in drums (Provided by department) and safely shifting of conductor in the store under ETD-II, Agra.
56/SE(T)/LCZ/2025-26
Fabrication & erection of single pole for LT line on 09 M long ST pole with fixing of necessary clamps & other acessories like clamp hook,dead/suspension clamp,neutral clamp,ABC pressure clamp (if required) and danger board with clamp.(all material arranged by contractor except steel & pole if required).
64/SE(T)/LCZ/2025-26
Fabrication & erection of single pole for LT line on 09 M long ST pole with fixing of necessary clamps & other acessories like clamp hook,dead/suspension clamp,neutral clamp,ABC pressure clamp (if required) and danger board with clamp.(all material arranged by contractor except steel & pole if required).