Loading…
Loading…
4,567 results • Best match
05/E.D.C.(G.)/2026-27
Resagging/Re-stringing of lose old conductor of HT/LT line alongwith opening & Binding of insulator/Re-stringing of line & its proper binding and jumpering.
06/E.D.C.(G.)/2026-27
Resagging/Re-stringing of lose old conductor of HT/LT line alongwith opening & Binding of insulator/Re-stringing of line & its proper binding and jumpering.
ETNo-16/EDC-1/MT/2026-27
Earthing of each HT/LT line pole & T/F properly after drive of electrodes if size 20mm x 250 mm and connection the earthing point with GI wire. (as per UPPCL Respo).
18/E.D.C.(G.)/2026-27
Tilted pole Straightening/Resagging/Re-stringing of lose old conductor of HT/LT line alongwith opening & Binding of insulator/Re-stringing of line & its proper binding and jumpering.
15/E.D.C.(G.)/2026-27
Tilted pole Straightening/Resagging/Re-stringing of lose old conductor of HT/LT line alongwith opening & Binding of insulator/Re-stringing of line & its proper binding and jumpering.
14/E.D.C.(G.)/2026-27
Tilted pole Straightening/Resagging/Re-stringing of lose old conductor of HT/LT line alongwith opening & Binding of insulator/Re-stringing of line & its proper binding and jumpering.