Shifting/ Modification work of 220KV and 66KV EHT line including 66kV UG cable of HVPNL infringing Revised Namo Bharat Alignment (Cyber City to IFFCO Chowk, Gurugram).
Design check and approval of double circuit/ multi circuit type utility Monopole transmission line structure suitable for 66 /132/220 KV EHT line from reputed Govt Institutions like CPRI/IIT etc. including approval from HVPNL as per their specifications and requirements.
Utility shifting work for widening and strengthening of the road from Swar Kila Kheda to Bajpur Gadarpur Uttarakhand border from Ch. 0.00 to 12.10 (Length 12.10 Km) in Rampur district for the financial year 2025-26.
FOR SHIFTING LT LINE OF PUSHWADA FEEDER EMANATING FROM 33/11 KV SUB STATION SWAR RURAL (Maswasi) DUE TO WIDENING OF SWAR KILAKHEDA TO BAJPUR GADARPUR ROAD TH-SWAR RAMPUR AS PER REQUEST OF AE, PRANTIYA KHAND, PWD RAMPUR LT NO-505 POLE SHIFTING DATED- 02.12.2025
Work
Replacement of following damaged accessories in 33/11 KV /LT line -
Replacement of Pipe Poles with steel tubular poles at various locations in all section UESD Kakkar. T.S. No. 139/2025-26 (ON PARTIAL TURN KEY BASIS).
ERECTION OF LT LINE : Erection of LT Pole structure with Steel Tubular Pole 9 mtr. Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL.
04/E.D.C.(G.)/2026-27
Resagging/Re-stringing of lose old conductor of HT/LT line alongwith opening & Binding of insulator/Re-stringing of line & its proper binding and jumpering.
03/E.D.C.(G.)/2026-27
Resagging/Re-stringing of lose old conductor of HT/LT line alongwith opening & Binding of insulator/Re-stringing of line & its proper binding and jumpering.