Work under Daiveeya aapda against passed estimate under the jurisdiction of EDD-Shamli.
For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, and all other accessories by providing stone pad, holding clamps, f-bracket and nuts & bolts with proper earting using Earthing Rod etc. Single support 8.5 Mtr. long PCC Poles :-
Work under Daiveeya aapda against passed estimate under the jurisdiction of EDD-Thanabhawan.
For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, and all other accessories by providing stone pad, holding clamps, f-bracket and nuts & bolts with proper earting using Earthing Rod etc. Single support 8.5 Mtr. long PCC Poles :-
Work under Daiveeya aapda against passed estimate under the jurisdiction of EDD-Kairana.
For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, and all other accessories by providing stone pad, holding clamps, f-bracket and nuts & bolts with proper earting using Earthing Rod etc. Single support 8.5 Mtr. long PCC Poles :-
Work under Daiveeya aapda against passed estimate under the jurisdiction of EDD-Oon.
For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, and all other accessories by providing stone pad, holding clamps, f-bracket and nuts & bolts with proper earting using Earthing Rod etc. Single support 8.5 Mtr. long PCC Poles :-
Construction of retaining wall to the approach road of the bridge at km 9.90 of Uttur-Ontagodi-Mirji-Mallapura MDR (Completion of pending work) in Mudhol taluk of Bagalkote district (Under 4059-80-051-0-60-132 CMIDP for the year 2025-26)
R & R b) LT Wiring (From DTC to LT Line Through
ETNo-19/EDC-1/MT/2026-27
Earthing of each HT/LT line pole & T/F properly after drive of electrodes if size 20mm x 250 mm and connection the earthing point with GI wire. (as per UPPCL Respo).