BP 2026-27 WORKS IN THE AREA OF SDO BAGHPAT TOWN UNDER EDD BAGHPAT IN JURISDICTION OF EDC BAGHPAT
Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of support (pole) For HT/LT Line and complete work as per RESSPO Norms. PCC Pole 11 Mtr.
REPLACEMENT OF DAMAGED, LT ABC/LT NAKED WIRE LINE, EARTHING OF T/f, MISC. WORK IN SWITCH YARD, 250 KVA IInd Point, CAP. INC. OF DISTRIBUTION Tf 250 TO 400 KVA, CONSTRUCTION AND STRENGHTNING OF 11 KV U/g LINE, AT DIFFERENT SITE UNDER EUDD-MAYOHALL
Replacement of Damaged LT Line (ABC/Naked Conductor line by New ABC 3x120 sq mm ABC including fixing of as per site... arranged by the conctractor except 11 m ST Pole) including dismantling work of existing LT Line and it relatated work as safe Dismentaling of Existing Utility and after Erection of... Connection (single/Three Phase) as Steet lite and other existing thing Fixed on new Pole and LT Lines .
19/EDC(H)/2026-27
Stringing & Sagging ABC Cable (3x95+1x70+1x16) sq mm. winding & jumpering of LT Line With AB Conductor as per RESSPO norms AB Conductor Provided by Dpt and balance materials lin ke holding clamp eye hook suspension clamp &dead end clamp arranged by the conductor
41/SE(T)/LCZ/2026-27
Fabrication & erection of single pole for LT line on 8.5 M long PCC pole with fixing of necessary clamps & other acessories like clamp hook, dead/suspension clamp,neutral clamp,ABC pressure clamp (if required) and danger board with clamp.(all material arranged by contractor except steel & pole if required).
44/SE(T)/LCZ/2026-27
Fabrication & erection of single pole for LT line on 8.5 M long PCC pole with fixing of necessary clamps & other acessories like clamp hook, dead/suspension clamp,neutral clamp,ABC pressure clamp (if required) and danger board with clamp.(all material arranged by contractor except steel & pole if required).
43/SE(T)/LCZ/2026-27
Fabrication & erection of single pole for LT line on 8.5 M long PCC pole with fixing of necessary clamps & other acessories like clamp hook, dead/suspension clamp,neutral clamp,ABC pressure clamp (if required) and danger board with clamp.(all material arranged by contractor except steel & pole if required).